Tuesday, September 4, 2012

State Route 1 Improvements in Montara


State Route 1 Improvements in Montara

Caltrans will begin two improvement projects on State Route I in the town of Montara beginning the first week of September, 2012, immediately following the Labor Day weekend. The two projects are within the same limits on Route 1.

Left Turn Channelization Project.

The first project will install left turn channelization lanes along Cabrillo Highway at post mile 35.9, from 0.1 mile south of Carlos Street to 14th Avenue. This will involve grinding, resurfacing and replacing roadway structural sections. This will provide a refuge to decelerating and stopped vehicles which are waiting for an opportunity to cross the opposing traffic stream. This work will be performed at night and will consist of some noise from equipment. Monday through Thursday construction hours are 8:00 p.m. to 7:00 am. Friday and Saturday hours are 7:00 pm. to 10:00 am. Sunday 7:00 pm. to 10:00 am. One way traffic control will be in effect with changeable message and construction signs to help guide motorist during construction hours. Construction for this project is expected to end October 2012.

Asphalt Overlay Project.

The second project is an Asphalt Concrete Resurfacing in and near the Town of Montara, from 0.1 mile south of Marine Boulevard to 1.3 miles north of Second Street. Post mile 34.8 to 37.9. This project will replace sections of existing pavement thereby extending pavement life and creating a smoother driving surface. This work will be performed at night, Monday through Friday from 8:00 pm. to 8:00 am. One way traffic control will be in effect with changeable message and construction signs to help guide motorist during construction hours. Construction for this project is expected to end mid November, 2012.

One lane will remain open to traffic at all times during construction.

Note: Please be aware there may be heavy fog present at times. All work is weather dependent.

Motorists should be reminded to watch out for workers during these construction activities and "Slow for the Cone Zone”. Caltrans appreciates your patience as we work to improve the highways.

  

Further Information

                                                                                                                       
 

Contact Gidget Navarro (510) 286-5574                   
Public Information Officer (San Mateo County)
Or visit our website at www.dot.ca.gov/dist4

No comments:

Post a Comment