Date: February 20, 2013
District: 4 - Oakland
Contact: Gidget Navarro
Phone: 510-286-5574
FOR IMMEDIATE RELEASE
State Route 82 El Camino Real Drainage Project in Burlingame
San Mateo County- The
California Department of Transportation (Caltrans) will begin a drainage
project at 735 El Camino Real, at Camino Gables on February 25, 2013. (weather
permitting). This storm damaged repair project will upgrade 2 existing drainage
inlets with 8 new inlets in the southbound direction at post mile 13.7 between
the intersection of Oak Grove Avenue and Floribunda Avenue in Burlingame.
The new drainage system will connect into an existing culvert. This
new drainage system will help alleviate any future flooding within this
location.
Tree protection will be installed to protect the eucalyptus trees
along the property. A 6 foot chainlink fence will be replaced adjacent to the
sidewalk over the existing culvert at final construction.
Construction is expected to take 30 working days (weather
permitting). Crews will be closing the southbound far right lane. The
southbound traffic will be diverted over to the center traffic lane which will
remain open at all times. Traffic control will be in effect during
construction. Crews will begin work as early as 8:00 am. to 4:00 pm.
Changeable Message Signs are present to warn
motorist and pedestrians of construction activities and closures.
Note:
Construction activities will begin when the weather forecast reveals two or
more consecutive weeks of dry weather.
Motorists are advised to expect minor delays and to use
alternate routes. Please be alert for workers and “Slow for the Cone Zone.”
"Follow us on Twitter @CaltransD4 for the most recent project
updates."
###
No comments:
Post a Comment