Date: October 1, 2013
District: 4 - Oakland
Contact: Allyn Amsk
Phone: 510/286-5445
FOR IMMEDIATE RELEASE
U.S. 101 Airport Blvd. Interchange
Project
Full Freeway Closures Scheduled for
Falsework Installation
SONOMA COUNTY – In October Caltrans
is planning full freeway closures of U.S. 101 at Airport Boulevard in order to
install falsework to begin construction of a new bridge. Falsework is a temporary structure that will support the
components of a bridge during construction.
- Southbound
U.S. 101 at Airport Boulevard will be closed Tuesday night, October 15,
and Wednesday night, October 16, from 11 p.m. to 5 a.m. Detour: Exit on Shiloh Road and
turn left. Continue to Old Redwood Highway and turn right. Turn right on
Fulton Road and continue to the southbound U.S. 101 loop on-ramp.
- There
will also be full freeway closures of northbound U.S. 101 at Airport
Boulevard. Closure times will be announced as soon as they are scheduled.
This
work is weather dependent. If it is delayed due to weather conditions, it will
be rescheduled for a later time. Please drive cautiously through the
construction zone and leave a safe traveling distance between your vehicle and
the vehicle ahead of you. Please
remember to Slow for the Cone Zone. The California Highway Patrol will be on
site during these closures.
For
more information about the project, visit the webpage at
www.dot.ca.gov/dist4/101airportblvd/. Follow us on
Twitter: Caltrans District 4 @Sonoma101
###
No comments:
Post a Comment