State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 16, 2016
District: 4-Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Eastbound I-80/Southbound I-680 Green Valley Road-Fairfield
3-Day Offramp and Onramp Closures
Start Friday, May 20 at 10:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans) and its project partner the Solano Transportation Authority (STA) are nearing completion of the new Green Valley Road overcrossing above Interstate-80 (I-80) in Solano County.
As part of the work, starting Friday, May 20, crews will begin constructing the permanent roadway connection from the eastbound I-80 Green Valley Road off-ramp to the new Green Valley Road overcrossing.
EB I-80 Green Valley Road Offramp & Onramp-3-Day Closure
For worker and public safety, the Green Valley Road offramp from eastbound I-80, the onramp from Green Valley Road onto eastbound I-80 and southbound I-680 will be closed for three days. Closure starts Friday, May 20 at 10:00 PM until Monday, May 23 at 2:00 PM.
During the off-ramp closure, motorists traveling to Green Valley Road from eastbound I-80 are advised to exit eastbound I-80 at either the Red Top Road or Suisun Valley Road exits.
SEE LINK TO PROJECT WEBPAGE FOR DETAILED DETOUR MAPS:
http://www.dot.ca.gov/dist4/projects/solano8068012/
Eastbound I-80 Green Valley Road Offramp-3 Day Closure
• Detour-To Green Valley Road via Red Top Road
Motorists traveling to Green Valley Road via Red Top Road should exit eastbound I-80 at Red Top Road, then eastbound on Red Top Road, then northbound on Lopes Road, then continue on Lopes Road across the overcrossing until it becomes Green Valley Road.
• Detour-To Green Valley Road via Suisun Valley Road
Motorists traveling to Green Valley Road via Suisun Valley Road should exit eastbound I-80 at Suisun Valley Road, then westbound on Pittman Road, then northbound across the
I-80/Suisun Valley Road overcrossing, and westbound on Business Center Drive for about a 1/2 mile until reaching Green Valley Road.
Eastbound I-80/Southbound I-680 Green Valley Road Onramp-3-Day Closure
During the work, the Eastbound I-80 onramp and I-680 onramp from Green Valley Road will also be closed. Closure starts Friday, May 20 at 10:00 PM until Monday, May 23 at 2:00 PM.
• Detour-From Southbound Green Valley Road to Southbound I-680 Onramp
Motorists traveling from southbound Green Valley Road to southbound I-680 are advised to travel southbound on Green Valley Road, continue on southbound Lopes Road, then eastbound on Gold Hill Road and enter southbound I-680 from Gold Hill Road.
• Detour-From Northbound Green Valley Road to Southbound I-680 Onramp
Motorists traveling from northbound Green Valley Road to southbound I-680 are advised to make a U-turn at Business Center Drive, then southbound on Green Valley road, continue on southbound Lopes Road, then eastbound on Gold Hill Road and enter southbound I-680 from Gold Hill Road.
• Detour-From Southbound Green Valley Road to Eastbound I-80 onramp
Motorists traveling from southbound Green Valley road to eastbound I-80 are advised to travel southbound on Green Valley Road, then westbound on Red Top Road and enter eastbound I-80 from Red Top Road.
• Detour-From Northbound Green Valley Road to Eastbound I-80 onramp
Motorists traveling from northbound Green Valley Road to eastbound I-80 are advised to travel from Green Valley Road to eastbound Business Center Drive, southbound on Suisun Valley road, continued onto the overcrossing onto Pittman road, and enter eastbound I-80 from Pittman Road.
Motorists should expect delays and watch for detour signs and flaggers. The CHP will assist with traffic controls. All work is weather permitting.
Project Benefits
Once this stage of work is complete, motorists will be able to exit eastbound I-80 at Green Valley Road again, and for the first time travel northbound and southbound on the new Green Valley Road overcrossing above I-80. The new overcrossing will include new northbound and southbound traffic lanes, a new sidewalk, and a new bicycle lane.
Get additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/Caltrans
Caltrans thanks you for your patience as we work to improve California’s highways.
Please be #BeWorkZoneAlert.
# # #
Caltrans District 4 - Working to bring you safe, efficient, accessible, and environmentally responsible highways and bridges in the Bay Area.
Showing posts with label #Caltrans #I80 #I-80 Interstate-80 #Fairfield #80_680_12 #Interchange #GreenValleyRoad #Overcrossing #Solano. Show all posts
Showing posts with label #Caltrans #I80 #I-80 Interstate-80 #Fairfield #80_680_12 #Interchange #GreenValleyRoad #Overcrossing #Solano. Show all posts
Monday, May 16, 2016
Monday, April 25, 2016
I-80/Green Valley Road-Fairfield-Temp Traffic Lanes-Start April 29
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: April 25, 2016
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Interstate 80/Green Valley Road Overcrossing-Fairfield
Watch for Temporary Traffic Lanes
Start Friday, April 29
SOLANO COUNTY – The California Department of Transportation (Caltrans) and its project partner the Solano Transportation Authority (STA) are nearing completion of construction of the new Green Valley Road overcrossing above Interstate-80 (I-80) in Solano County.
Green Valley Road-I-80-New Lane Configuration-Friday, April 29
Starting Friday, April 29, northbound traffic on the Green Valley Road overcrossing above westbound and eastbound I-80 will be routed onto the new overcrossing. Southbound traffic will continue to use the existing lanes on the existing overcrossing.
The temporary configuration will allow crews to continue work on new approach lanes and prepare for demolition of the old overcrossing. This configuration will be in place for about six weeks until the new overcrossing is opened northbound and southbound.
Eastbound I-80 to Green Valley Road Exit-Detour
Starting April 29 until further notice, motorists exiting Green Valley Road from eastbound I-80 will be directed in the southbound direction only due to the temporary traffic on the existing overcrossing. Northbound Green Valley Road motorists from eastbound I-80 are advised to use the eastbound I-80 Suisun Valley Road exit as a detour.
NB Green Valley Road Traffic-Using Suisun Valley Road Detour
Motorists headed to northbound Green Valley Road and using Suisun Valley Road as detour are advised to exit Suisun Valley Road, turn left at Pittman Road, proceed across the I-80 overcrossing onto northbound Suisun Valley Road, then westbound on Business Center Drive, and proceed on Business Center Drive for about a ¼ mile to Green Valley Road.
Motorists should watch for flaggers and expect delays. The Fairfield Police Department will assist with traffic controls. All work is weather permitting.
Get additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/Caltrans
Please be #BeWorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: April 25, 2016
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Interstate 80/Green Valley Road Overcrossing-Fairfield
Watch for Temporary Traffic Lanes
Start Friday, April 29
SOLANO COUNTY – The California Department of Transportation (Caltrans) and its project partner the Solano Transportation Authority (STA) are nearing completion of construction of the new Green Valley Road overcrossing above Interstate-80 (I-80) in Solano County.
Green Valley Road-I-80-New Lane Configuration-Friday, April 29
Starting Friday, April 29, northbound traffic on the Green Valley Road overcrossing above westbound and eastbound I-80 will be routed onto the new overcrossing. Southbound traffic will continue to use the existing lanes on the existing overcrossing.
The temporary configuration will allow crews to continue work on new approach lanes and prepare for demolition of the old overcrossing. This configuration will be in place for about six weeks until the new overcrossing is opened northbound and southbound.
Eastbound I-80 to Green Valley Road Exit-Detour
Starting April 29 until further notice, motorists exiting Green Valley Road from eastbound I-80 will be directed in the southbound direction only due to the temporary traffic on the existing overcrossing. Northbound Green Valley Road motorists from eastbound I-80 are advised to use the eastbound I-80 Suisun Valley Road exit as a detour.
NB Green Valley Road Traffic-Using Suisun Valley Road Detour
Motorists headed to northbound Green Valley Road and using Suisun Valley Road as detour are advised to exit Suisun Valley Road, turn left at Pittman Road, proceed across the I-80 overcrossing onto northbound Suisun Valley Road, then westbound on Business Center Drive, and proceed on Business Center Drive for about a ¼ mile to Green Valley Road.
Motorists should watch for flaggers and expect delays. The Fairfield Police Department will assist with traffic controls. All work is weather permitting.
Get additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/Caltrans
Please be #BeWorkZoneAlert.
# # #
Friday, March 25, 2016
I-80/I-680/SR-12 Interchange-Temp Lanes-Spring 2016
State of California • Department of Transportation
CONSTRUCTION NOTICE
Date: March 25, 2016
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12-Interchange Project-Fairfield
Temporary Lane Switches on Green Valley Road
Spring 2016
SOLANO COUNTY – The California Department of Transportation (Caltrans) and its project partner the Solano Transportation Authority (STA) are nearing completion of construction of the new Green Valley Road overcrossing across Interstate-80 (I-80) in Solano County. The work is part of the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project.
Spring 2016-Project Updates
People traveling and living near the construction zone may encounter temporary lane switches, intermittent lane closures, and see increased heavy construction equipment as crews begin work to eventually switch all traffic onto the new Green Valley Road/I-80 overcrossing.
Temporary Travel Lanes-Northbound Green Valley Road
Northbound traffic on the Green Valley Road/I-80 overcrossing will be temporarily routed onto both lanes of the new Green Valley Road/I-80 overcrossing while crews construct new approach lanes just north and south of the new overcrossing. Motorists are advised to drive with caution.
Temporary Travel Lanes-Southbound Green Valley Road
Southbound traffic on the Green Valley Road/I-80 overcrossing will be temporarily routed onto the two existing lanes on the existing overcrossing. The temporary configuration will allow crews to continue work on the new approach lanes while preparing for demolition of the existing overcrossing. All work is weather permitting.
Temporary Alignments-In Effect-Tentatively April 2016
The temporary traffic configurations are tentatively scheduled to begin in spring 2016 through fall 2016.Caltrans will make an announcement once additional details are available.
Project Schedule
Construction of Package 1 of the 80/680/12 Interchange Project started in spring 2014. The new Green Valley Road/I-80 overcrossing may be open to traffic in both directions as early as fall 2016.
Message Signs
Stationary mounted signs and changeable message signs (CMS) will be strategically placed to provide information regarding closures and detours.
Online Information
Get additional project information:
http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/Caltrans
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please be #BeWorkZoneAlert.
# # #
CONSTRUCTION NOTICE
Date: March 25, 2016
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12-Interchange Project-Fairfield
Temporary Lane Switches on Green Valley Road
Spring 2016
SOLANO COUNTY – The California Department of Transportation (Caltrans) and its project partner the Solano Transportation Authority (STA) are nearing completion of construction of the new Green Valley Road overcrossing across Interstate-80 (I-80) in Solano County. The work is part of the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project.
Spring 2016-Project Updates
People traveling and living near the construction zone may encounter temporary lane switches, intermittent lane closures, and see increased heavy construction equipment as crews begin work to eventually switch all traffic onto the new Green Valley Road/I-80 overcrossing.
Temporary Travel Lanes-Northbound Green Valley Road
Northbound traffic on the Green Valley Road/I-80 overcrossing will be temporarily routed onto both lanes of the new Green Valley Road/I-80 overcrossing while crews construct new approach lanes just north and south of the new overcrossing. Motorists are advised to drive with caution.
Temporary Travel Lanes-Southbound Green Valley Road
Southbound traffic on the Green Valley Road/I-80 overcrossing will be temporarily routed onto the two existing lanes on the existing overcrossing. The temporary configuration will allow crews to continue work on the new approach lanes while preparing for demolition of the existing overcrossing. All work is weather permitting.
Temporary Alignments-In Effect-Tentatively April 2016
The temporary traffic configurations are tentatively scheduled to begin in spring 2016 through fall 2016.Caltrans will make an announcement once additional details are available.
Project Schedule
Construction of Package 1 of the 80/680/12 Interchange Project started in spring 2014. The new Green Valley Road/I-80 overcrossing may be open to traffic in both directions as early as fall 2016.
Message Signs
Stationary mounted signs and changeable message signs (CMS) will be strategically placed to provide information regarding closures and detours.
Online Information
Get additional project information:
http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/Caltrans
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please be #BeWorkZoneAlert.
# # #
Monday, November 16, 2015
Eastbound I-80-Fairfield-Overnight Highway Closures-wk of 11-16-18
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: November 16, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound I-80-Overnight Full Highway Closures
I-80/I-680/SR-12 Interchange Project-Fairfield
Continue Week of Monday, November 16
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Crews will continue removing the temporary wooden false work on the new Green Valley Road overcrossing above I-80 and I-680. The work will occur during five consecutive nights Monday, November 16 until the morning on Saturday, November 21.
Eastbound I-80 at Green Valley Road-Full Overnight Highway Closure
To ensure worker and public safety, a full overnight highway closure will be in effect on eastbound I-80 between Green Valley Road and the I-80/I-680 interchange nightly Monday, November 16 until Friday, November 20 starting at 11:00 PM until 4:00 AM the following mornings.
Eastbound I-80 Detours
Motorists traveling on eastbound I-80 at Green Valley Road will be detoured onto southbound I-680, exit Gold Hill Road, enter northbound I-680 from Gold Hill, and enter eastbound I-80 from northbound I-680. Detour signs will be posted. Motorists should expect delays. All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: November 16, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound I-80-Overnight Full Highway Closures
I-80/I-680/SR-12 Interchange Project-Fairfield
Continue Week of Monday, November 16
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Crews will continue removing the temporary wooden false work on the new Green Valley Road overcrossing above I-80 and I-680. The work will occur during five consecutive nights Monday, November 16 until the morning on Saturday, November 21.
Eastbound I-80 at Green Valley Road-Full Overnight Highway Closure
To ensure worker and public safety, a full overnight highway closure will be in effect on eastbound I-80 between Green Valley Road and the I-80/I-680 interchange nightly Monday, November 16 until Friday, November 20 starting at 11:00 PM until 4:00 AM the following mornings.
Eastbound I-80 Detours
Motorists traveling on eastbound I-80 at Green Valley Road will be detoured onto southbound I-680, exit Gold Hill Road, enter northbound I-680 from Gold Hill, and enter eastbound I-80 from northbound I-680. Detour signs will be posted. Motorists should expect delays. All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
Monday, November 2, 2015
80/680/12 Project-Fairfield-EB I-80 Night Closures-Start Nov 9
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: November 3, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12 Interchange Project -Fairfield
Westbound I-80 Closures Completed
Eastbound I-80 Full Overnight Highway Closures Start November 9
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) are continuing construction of the new Green Valley Road/Interstate 80 (I-80) overcrossing above I-80 in Fairfield as part of the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project.
Westbound I-80 Overnight-Work Completed
Crews have now completed removing false work on the new Green Valley Road/I-80 overcrossing above westbound I-80. As a result, the remaining nights of westbound I-80 closures which started October 26 until November 6 have been cancelled.
Eastbound I-80 Overnight-Work Starts November 9
Work will now move to the eastbound I-80 side of the Green Valley Road overcrossing.
To ensure worker and public safety, two weeks of night work on eastbound I-80 are now scheduled starting Monday, November 9 until Friday, November 20 starting at 11:00 PM each night until 4:00 AM the following mornings. All work is weather permitting.
Detour Routes-Eastbound I-80 Proceeding to San Francisco
Eastbound I-80 detour starts at Green Valley Road Exit. Eastbound I-80 motorists will be detoured to the Green Valley Road off ramp, then proceed along the on ramp adjacent to mainline eastbound I-80, then re-enter eastbound I-80.
The Eastbound I-80 to Southbound I-680 Connector Ramp will remain open.
Motorists should expect delays. Detour signs will be posted. Please #BeWorkZoneAlert
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter at: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: November 3, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12 Interchange Project -Fairfield
Westbound I-80 Closures Completed
Eastbound I-80 Full Overnight Highway Closures Start November 9
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) are continuing construction of the new Green Valley Road/Interstate 80 (I-80) overcrossing above I-80 in Fairfield as part of the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project.
Westbound I-80 Overnight-Work Completed
Crews have now completed removing false work on the new Green Valley Road/I-80 overcrossing above westbound I-80. As a result, the remaining nights of westbound I-80 closures which started October 26 until November 6 have been cancelled.
Eastbound I-80 Overnight-Work Starts November 9
Work will now move to the eastbound I-80 side of the Green Valley Road overcrossing.
To ensure worker and public safety, two weeks of night work on eastbound I-80 are now scheduled starting Monday, November 9 until Friday, November 20 starting at 11:00 PM each night until 4:00 AM the following mornings. All work is weather permitting.
Detour Routes-Eastbound I-80 Proceeding to San Francisco
Eastbound I-80 detour starts at Green Valley Road Exit. Eastbound I-80 motorists will be detoured to the Green Valley Road off ramp, then proceed along the on ramp adjacent to mainline eastbound I-80, then re-enter eastbound I-80.
The Eastbound I-80 to Southbound I-680 Connector Ramp will remain open.
Motorists should expect delays. Detour signs will be posted. Please #BeWorkZoneAlert
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter at: https://twitter.com/CaltransD4
# # #
Tuesday, October 27, 2015
I80/I680/SR12 Fairfield-Green Valley Rd Lane Closures- Start Oct 29
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: October 27, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12 Interchange Project-Fairfield
Daytime Alternating Lane Closures on Green Valley Road
Start Wednesday, October 28 at 8:00AM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Starting Wednesday, October 29, crews will install a water line related to the I-80/I-680/SR-12 project along Green Valley Road near Business Center Drive in Fairfield.
The work will occur during three consecutive days starting at 8:00 AM until 5:00 PM each day Wednesday, October 28, Thursday, October 29 and Friday, October 30.
Alternating Lane Closures on Green Valley Road
To ensure worker and public safety, crews will alternate the closure of northbound and southbound traffic lanes on Green Valley Road near Business Center Drive.
One traffic lane on Green Valley Road will be open at all times.
Motorists should expect delays and watch for flaggers as traffic is routed onto one traffic lane through the construction zone during the one-way traffic controls.
All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
Caltrans thanks you for your patience as we work to improve California’s highways.
# # #
TRAFFIC ADVISORY
Date: October 27, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
I-80/I-680/SR-12 Interchange Project-Fairfield
Daytime Alternating Lane Closures on Green Valley Road
Start Wednesday, October 28 at 8:00AM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Starting Wednesday, October 29, crews will install a water line related to the I-80/I-680/SR-12 project along Green Valley Road near Business Center Drive in Fairfield.
The work will occur during three consecutive days starting at 8:00 AM until 5:00 PM each day Wednesday, October 28, Thursday, October 29 and Friday, October 30.
Alternating Lane Closures on Green Valley Road
To ensure worker and public safety, crews will alternate the closure of northbound and southbound traffic lanes on Green Valley Road near Business Center Drive.
One traffic lane on Green Valley Road will be open at all times.
Motorists should expect delays and watch for flaggers as traffic is routed onto one traffic lane through the construction zone during the one-way traffic controls.
All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
Caltrans thanks you for your patience as we work to improve California’s highways.
# # #
Friday, October 23, 2015
WB I-80 Fairfield-Overnight Closures Start Oct 26
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: October 23, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield
Reminder Full Overnight Highway Closures-Two Weeks
Start Monday, October 26
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) will remove the temporary wooden false work on the new Green Valley Road/Interstate 80 (I-80) overcrossing above I-80 in Fairfield as part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Start October 26
To ensure worker and public safety, two weeks of night work on westbound I-80 are now scheduled starting Monday, October 26 until Friday, November 6 from 10:30 PM each night until 4:00 AM the following mornings. All work is weather permitting.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to EB-80 Connector Ramp, then exit at Suisun Valley Road off ramp, turn left at Suisun Valley Road Overcrossing, then left on Business Center Drive, then left onto Green Valley Road, and enter westbound I-80.
Motorists should expect delays. Detour signs will be posted.
Please #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: October 23, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield
Reminder Full Overnight Highway Closures-Two Weeks
Start Monday, October 26
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) will remove the temporary wooden false work on the new Green Valley Road/Interstate 80 (I-80) overcrossing above I-80 in Fairfield as part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Start October 26
To ensure worker and public safety, two weeks of night work on westbound I-80 are now scheduled starting Monday, October 26 until Friday, November 6 from 10:30 PM each night until 4:00 AM the following mornings. All work is weather permitting.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to EB-80 Connector Ramp, then exit at Suisun Valley Road off ramp, turn left at Suisun Valley Road Overcrossing, then left on Business Center Drive, then left onto Green Valley Road, and enter westbound I-80.
Motorists should expect delays. Detour signs will be posted.
Please #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
Friday, October 2, 2015
EB I-80 Green Valley Road Onramp Closure-Fairfield-Starts 10-5
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: October 2, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound I-80-Green Valley Road Onramp Closure
I-80/I-680/SR-12 Interchange Project-Fairfield
Overnight Closures-Start Monday, October 5 at 10:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Starting the night of Monday, October 5 crews will begin removing the temporary wooden false work on the new Green Valley Road overcrossing above I-80 and I-680. The work will occur during five consecutive nights starting Monday, October 5 until the morning on Saturday, October 10.
Eastbound I-80 Onramp from Green Valley Road Closure
To ensure worker and public safety, the eastbound I-80 onramp from Green Valley Road will be closed nightly Monday, October 5 until Friday, October 9 starting at 10:00 PM until 4:00 AM the following mornings.
Motorists heading onto eastbound I-80 from Green Valley Road will be detoured onto southbound I-680, exit Gold Hill Road, enter northbound I-680 from Gold Hill, and onto eastbound I-80 from northbound I-680.
Motorists should expect delays. All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: October 2, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound I-80-Green Valley Road Onramp Closure
I-80/I-680/SR-12 Interchange Project-Fairfield
Overnight Closures-Start Monday, October 5 at 10:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 (I-80/I-680/SR-12) Interchange Project in Fairfield.
Starting the night of Monday, October 5 crews will begin removing the temporary wooden false work on the new Green Valley Road overcrossing above I-80 and I-680. The work will occur during five consecutive nights starting Monday, October 5 until the morning on Saturday, October 10.
Eastbound I-80 Onramp from Green Valley Road Closure
To ensure worker and public safety, the eastbound I-80 onramp from Green Valley Road will be closed nightly Monday, October 5 until Friday, October 9 starting at 10:00 PM until 4:00 AM the following mornings.
Motorists heading onto eastbound I-80 from Green Valley Road will be detoured onto southbound I-680, exit Gold Hill Road, enter northbound I-680 from Gold Hill, and onto eastbound I-80 from northbound I-680.
Motorists should expect delays. All work is weather permitting. #BeWorkZoneAlert
I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed just east of the existing overcrossing. It will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/SR-12. The connector ramp from westbound I-80 to westbound SR-12 also will be widened from one to two lanes.
For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4
# # #
Thursday, June 25, 2015
WB I-80 Fairfield-Overnight Intermittent Full Hwy Closures-6-26-15
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: June 25, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate-80 Green Valley Road-Fairfield
Overnight Intermittent-Full Highway Closures
Friday, June 26, 2015
SOLANO COUNTY – The California Department of Transportation (Caltrans), and its project partner the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 Interchange Project in Fairfield.
As part of the project, crews will begin positioning equipment on and adjacent to the new Green Valley Road/Interstate 80 (I-80) overcrossing on westbound I-80 starting Friday, June 26 at 9:00PM. The equipment movement is in preparation of a nighttime concrete-pour on the new overcrossing structure also scheduled on Friday.
Intermittent overnight closures Westbound I-80-Friday, June 26 at 9:00PM
To ensure worker and public safety, intermittent closures on westbound I-80 between the westbound I-80 Cordelia Truck Scales and the Green Valley Road exit are scheduled Friday, June 26 starting at 9:00PM until Saturday, June 27 at 6:00AM.
CHP will assist with directing traffic. Closures will occur in 5-10 minute intervals.
As part of the work, the far left lane on westbound I-80 between the westbound Truck Scales and Green Valley Road will also be closed on Friday, June 26 at 9:00PM until Saturday, June 27 at 6:00AM. Motorists should expect delays.
All work is weather permitting. Please #BeWorkZoneAlert.
Caltrans thanks you for your patience as we work to improve California’s highways.
For additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: June 25, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate-80 Green Valley Road-Fairfield
Overnight Intermittent-Full Highway Closures
Friday, June 26, 2015
SOLANO COUNTY – The California Department of Transportation (Caltrans), and its project partner the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 Interchange Project in Fairfield.
As part of the project, crews will begin positioning equipment on and adjacent to the new Green Valley Road/Interstate 80 (I-80) overcrossing on westbound I-80 starting Friday, June 26 at 9:00PM. The equipment movement is in preparation of a nighttime concrete-pour on the new overcrossing structure also scheduled on Friday.
Intermittent overnight closures Westbound I-80-Friday, June 26 at 9:00PM
To ensure worker and public safety, intermittent closures on westbound I-80 between the westbound I-80 Cordelia Truck Scales and the Green Valley Road exit are scheduled Friday, June 26 starting at 9:00PM until Saturday, June 27 at 6:00AM.
CHP will assist with directing traffic. Closures will occur in 5-10 minute intervals.
As part of the work, the far left lane on westbound I-80 between the westbound Truck Scales and Green Valley Road will also be closed on Friday, June 26 at 9:00PM until Saturday, June 27 at 6:00AM. Motorists should expect delays.
All work is weather permitting. Please #BeWorkZoneAlert.
Caltrans thanks you for your patience as we work to improve California’s highways.
For additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter: https://twitter.com/CaltransD4
# # #
Friday, June 12, 2015
Eastbound I-80- Green Valley Road Onramp-June 12-Night Closure
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: June 12, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound Interstate-80 Green Valley Road-Fairfield
Overnight Closures-Start Friday, June 12 at 10:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and its project partner the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 Interchange Project in Fairfield.
As part of the project, crews will begin pouring concrete on the decking of the new Green Valley Road/Interstate 80 (I-80) overcrossing starting Friday, June 12 at 10:00PM.
Eastbound I-80 Onramp from Green Valley Road-Overnight Closure
To ensure worker and public safety, the eastbound I-80 onramp from Green Valley Road will be closed starting Friday, June 12 at 10:00 PM until Saturday, June 13 at 7:00 AM.
During the eastbound I-80 onramp closure, the following detour will be in effect:
Motorists heading to eastbound I-80 from Green Valley Road are advised to enter southbound I-680, then exit Gold Hill Road, and enter northbound I-680 from Gold Hill Road, then proceed on northbound I-680, and enter eastbound I-80 from northbound I-680. Detour signs will be posted.
Motorists should expect delays. All work is weather permitting.
Please #BeWorkZoneAlert.
Caltrans thanks you for your patience as we work to improve California’s highways.
For additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter: https://twitter.com/CaltransD4
# # #
TRAFFIC ADVISORY
Date: June 12, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Eastbound Interstate-80 Green Valley Road-Fairfield
Overnight Closures-Start Friday, June 12 at 10:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans), and its project partner the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/State Route-12 Interchange Project in Fairfield.
As part of the project, crews will begin pouring concrete on the decking of the new Green Valley Road/Interstate 80 (I-80) overcrossing starting Friday, June 12 at 10:00PM.
Eastbound I-80 Onramp from Green Valley Road-Overnight Closure
To ensure worker and public safety, the eastbound I-80 onramp from Green Valley Road will be closed starting Friday, June 12 at 10:00 PM until Saturday, June 13 at 7:00 AM.
During the eastbound I-80 onramp closure, the following detour will be in effect:
Motorists heading to eastbound I-80 from Green Valley Road are advised to enter southbound I-680, then exit Gold Hill Road, and enter northbound I-680 from Gold Hill Road, then proceed on northbound I-680, and enter eastbound I-80 from northbound I-680. Detour signs will be posted.
Motorists should expect delays. All work is weather permitting.
Please #BeWorkZoneAlert.
Caltrans thanks you for your patience as we work to improve California’s highways.
For additional project information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans on Twitter: https://twitter.com/CaltransD4
# # #
Tuesday, April 21, 2015
I-80/I-680/SR 12 Interchange Project – Fairfield-April 2015 Update
State of California • Department of Transportation
NEWS RELEASE
Date: April 21, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
I-80/I-680/SR 12 Interchange Project – Fairfield
Increased Construction Activities resume April 2015
SOLANO COUNTY– Caltrans and its project partner, the Solano Transportation Authority (STA), have completed preliminary false work installation on the new I-80 Green Valley Road Overcrossing. The false work installation completed on April 9th required a full closure on I-80. The preliminary work marks a major milestone in this first package of the Interstate 80/Interstate 680/State Route 12 (I-80/I-680/SR 12) Interchange Project.
Pile-Driving Operations
With the metal beams of the new overcrossing installed, businesses and residents near the construction site may encounter increased noise due to the resumption of daytime pile-driving at the adjacent I-680/I-80 interchange, and the site of the new westbound I-80 to westbound SR 12 connector. Pile-driving is scheduled to resume in mid-April 2015 until fall 2015. Normal pile-driving hours are 9:00AM until 5:00PM Monday-Friday.
Increased Material Import
Motorists and residents near the construction zone may encounter temporary detours, intermittent lane closures, pile-driving, and see increased heavy construction equipment. All work is weather permitting.
Daytime travel delays may also be likely due to increased material hauling activity near Green Valley Road and Business Center Drive starting mid-April 2015. Motorists should watch for flaggers and changeable message signs.
Caltrans will make announcements when detour routes are necessary.
Online Information
Get additional project information on our Caltrans project webpage:
http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
Please be #BeWorkZoneAlert
-MORE-
Support Beam Installation
Crews completed false work installation on Westbound I-80 at the new Green Valley Road Overcrossing (Photo courtesy of Caltrans, April 2015)
Support Beam Installation
View from the partially completed I-80 Green Valley Road overcrossing. (Photo Courtesy of Caltrans, April 2015)
Atop the new Overcrossing
The new Green Valley Road overcrossing begins to take shape from above I-80. (Photo Courtesy of Caltrans, April 2015)
Retaining Wall Construction
New retaining walls completed near the I-80/I-680 Interchange in Fairfield.
(Photo Courtesy of Caltrans, April 2015)
###
NEWS RELEASE
Date: April 21, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
I-80/I-680/SR 12 Interchange Project – Fairfield
Increased Construction Activities resume April 2015
SOLANO COUNTY– Caltrans and its project partner, the Solano Transportation Authority (STA), have completed preliminary false work installation on the new I-80 Green Valley Road Overcrossing. The false work installation completed on April 9th required a full closure on I-80. The preliminary work marks a major milestone in this first package of the Interstate 80/Interstate 680/State Route 12 (I-80/I-680/SR 12) Interchange Project.
Pile-Driving Operations
With the metal beams of the new overcrossing installed, businesses and residents near the construction site may encounter increased noise due to the resumption of daytime pile-driving at the adjacent I-680/I-80 interchange, and the site of the new westbound I-80 to westbound SR 12 connector. Pile-driving is scheduled to resume in mid-April 2015 until fall 2015. Normal pile-driving hours are 9:00AM until 5:00PM Monday-Friday.
Increased Material Import
Motorists and residents near the construction zone may encounter temporary detours, intermittent lane closures, pile-driving, and see increased heavy construction equipment. All work is weather permitting.
Daytime travel delays may also be likely due to increased material hauling activity near Green Valley Road and Business Center Drive starting mid-April 2015. Motorists should watch for flaggers and changeable message signs.
Caltrans will make announcements when detour routes are necessary.
Online Information
Get additional project information on our Caltrans project webpage:
http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
Please be #BeWorkZoneAlert
-MORE-
Support Beam Installation
Crews completed false work installation on Westbound I-80 at the new Green Valley Road Overcrossing (Photo courtesy of Caltrans, April 2015)
Support Beam Installation
View from the partially completed I-80 Green Valley Road overcrossing. (Photo Courtesy of Caltrans, April 2015)
Atop the new Overcrossing
The new Green Valley Road overcrossing begins to take shape from above I-80. (Photo Courtesy of Caltrans, April 2015)
Retaining Wall Construction
New retaining walls completed near the I-80/I-680 Interchange in Fairfield.
(Photo Courtesy of Caltrans, April 2015)
###
Friday, April 10, 2015
Westbound I-80-Fairfield-April 10-Hwy Closure Canceled
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: April 10, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield
Friday, April 10-Full Highway Closure Canceled
False Work Installation Completed
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) have canceled Friday’s overnight full highway closure of Westbound Interstate-80 in Fairfield. That closure was scheduled to start Friday, April 10 at 10:30 PM until Saturday, April 11 at 3:00 AM.
Crews were able to complete false work installation over westbound I-80 the night of Thursday, April 9.
The work is part of the I-80/I-680/SR-12 Interchange Project.
For additional information, go to our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
For real-time traffic anytime, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
Please be #WorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: April 10, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield
Friday, April 10-Full Highway Closure Canceled
False Work Installation Completed
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) have canceled Friday’s overnight full highway closure of Westbound Interstate-80 in Fairfield. That closure was scheduled to start Friday, April 10 at 10:30 PM until Saturday, April 11 at 3:00 AM.
Crews were able to complete false work installation over westbound I-80 the night of Thursday, April 9.
The work is part of the I-80/I-680/SR-12 Interchange Project.
For additional information, go to our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
For real-time traffic anytime, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
Please be #WorkZoneAlert.
# # #
Tuesday, April 7, 2015
WB I-80 Fairfield-Full Hwy Closures Start April 7 @ 10:30 PM
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: April 7, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield-Full Highway Closures
Tuesday, April 7 Work Will Proceed as Scheduled
Closures Start at 10:30 PM
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) will proceed with overnight false work installation on westbound Interstate-80 (I-80) in Fairfield for the night of Tuesday, April 7. The work is part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Updated Schedule
To ensure worker and public safety, four consecutive nights of work on westbound I-80 are now scheduled starting Tuesday, April 7 until Friday, April 10 from 10:30 PM each night until 3:00 AM the following mornings. Detour signs will be posted and all work is weather permitting.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to Green Valley Road, left on Central Way, left on Pittman Road, continue to Suisun Valley Road, left on Business Center Drive, then left on Green Valley Road, and enter westbound I-80.
For real-time traffic, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
See our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
# # #
TRAFFIC ADVISORY
Date: April 7, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield-Full Highway Closures
Tuesday, April 7 Work Will Proceed as Scheduled
Closures Start at 10:30 PM
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) will proceed with overnight false work installation on westbound Interstate-80 (I-80) in Fairfield for the night of Tuesday, April 7. The work is part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Updated Schedule
To ensure worker and public safety, four consecutive nights of work on westbound I-80 are now scheduled starting Tuesday, April 7 until Friday, April 10 from 10:30 PM each night until 3:00 AM the following mornings. Detour signs will be posted and all work is weather permitting.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to Green Valley Road, left on Central Way, left on Pittman Road, continue to Suisun Valley Road, left on Business Center Drive, then left on Green Valley Road, and enter westbound I-80.
For real-time traffic, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
See our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
# # #
Monday, April 6, 2015
WB I-80 Fairfield-Hwy-Work Will Proceed as Weather Allows
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: April 6, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield-Full Highway Closures
Monday Night Work-Canceled Due To Rain
Work Will Proceed as Weather Allows
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) have cancelled overnight false work installation on westbound Interstate-80 (I-80) in Fairfield for the night of Monday, April 6 due to rain. Work will proceed on Tuesday, April 7 or as soon as weather allows. The work is part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Updated Schedule
To ensure worker and public safety, four consecutive nights of work on westbound I-80 are now scheduled starting Tuesday, April 7 until Friday, April 10 from 10:30 PM each night until 3:00 AM the following mornings. Detour signs will be posted and all work is weather permitting.
If Tuesday’s work is cancelled due to weather, Caltrans will make an announcement once a determination has been made.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to Green Valley Road, left on Central Way, left on Pittman Road, continue to Suisun Valley Road, left on Business Center Drive, then left on Green Valley Road, and enter westbound I-80.
For real-time traffic, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
See our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
# # #
TRAFFIC ADVISORY
Date: April 6, 2015
District: 4 – Oakland
Contact: Vince Jacala
Phone: (510) 286-5206
Westbound Interstate 80-Fairfield-Full Highway Closures
Monday Night Work-Canceled Due To Rain
Work Will Proceed as Weather Allows
SOLANO COUNTY– Caltrans and the Solano Transportation Authority (STA) have cancelled overnight false work installation on westbound Interstate-80 (I-80) in Fairfield for the night of Monday, April 6 due to rain. Work will proceed on Tuesday, April 7 or as soon as weather allows. The work is part of the I-80/I-680/SR-12 Interchange Project.
Westbound I-80 Overnight Closures-Updated Schedule
To ensure worker and public safety, four consecutive nights of work on westbound I-80 are now scheduled starting Tuesday, April 7 until Friday, April 10 from 10:30 PM each night until 3:00 AM the following mornings. Detour signs will be posted and all work is weather permitting.
If Tuesday’s work is cancelled due to weather, Caltrans will make an announcement once a determination has been made.
Detour Routes- Westbound I-80 detour starts at Suisun Valley Road. Westbound I-80 motorists will be detoured to the Suisun Valley Road exit, then onto Neitzel Road, left on Business Center Drive, left on Green Valley Road, then enter westbound I-80.
Northbound I-680 to westbound I-80 motorists will be detoured to Green Valley Road, left on Central Way, left on Pittman Road, continue to Suisun Valley Road, left on Business Center Drive, then left on Green Valley Road, and enter westbound I-80.
For real-time traffic, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
See our project webpage: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow us Caltrans on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to improve California’s highways.
# # #