Friday, January 16, 2015

Real McCoy Ferry State Route 84-Emergency Repairs-Jan 16

State of California • Department of Transportation

TRAFFIC ADVISORY

Date: January 16, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206

FOR IMMEDIATE RELEASE

Real McCoy II Ferry -Closed For Emergency Repairs
Friday, January 16

SOLANO COUNTY– The California Department of Transportation (Caltrans) has temporarily suspended service of the Real McCoy II Ferry on State Route 84 to perform emergency mechanical repairs.

As of Friday, January 16 at 9:00AM, service is suspended until further notice. Caltrans will notify the public once a time to return the boat to service is determined.
The Real McCoy II also known as the Cache Slough Ferry, provides regular service on State Route 84 between Ryer Island and the city of Rio Vista in Solano County.
The delta region ferry normally runs scheduled crossings every 20 minutes, on the hour, 20 minutes after the hour, and 40 minutes after the hour.

Real McCoy II Ferry Detour
During the service interruption, motorists are advised to use Highway 160 and the J-Mack Ferry along Highway 220.

For the latest information, motorists can call the Caltrans Ryer Island Ferry Update Line at (510) 622-0120.

Or check our Delta Ferries webpage:
http://www.dot.ca.gov/dist4/deltaferries/

Or follow Caltrans on Twitter at:
https://twitter.com/CaltransD4
###

Wednesday, January 14, 2015

Westbound I-80 at Green Valley Road-Fairfield-Overnight Lane Closures-Jan 14

State of California • Department of Transportation

TRAFFIC ADVISORY

Date: January 14, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206

FOR IMMEDIATE RELEASE

Westbound I-80 at Green Valley Road-Fairfield
Overnight Lane Closures
Start Wednesday, January 14 at 8PM

SOLANO COUNTY – The California Department of Transportation (Caltrans), and its project partner the Solano Transportation Authority (STA) are continuing work on the Interstate-80/Interstate-680/Highway 12 Interchange Project in Fairfield.

Starting the night of Wednesday, January 14, crews will install solar-powered construction warning signs, warning beacons, and stripe temporary traffic lanes on westbound Interstate-80 (I-80) near the Green Valley Road exit.

Westbound I-80-Overnight Lane Closures
To ensure worker and public safety, up to three of the four traffic lanes on westbound
I-80 near the Green Valley Road exit will be closed starting Wednesday, January 14 at 8:00 PM until 5:00 AM on Thursday, January 15. One westbound traffic lane will remain open at all times.

Motorists should expect delays. All work is weather permitting. The posted speed limit through the construction zone on westbound I-80 in Fairfield is 55 miles per hour. Please remember to “Move Over” or “Slow Down”, it’s the law. #workzonealert

I-80/I-680/Highway-12 Project Improvements:
A new Green Valley Road overcrossing is being constructed above I-80 about 200 feet east of the existing overcrossing. The new overcrossing will have twice the number of lanes (4) as the existing overcrossing (2), along with a new on ramp to westbound I-80/Highway-12. The connector ramp from westbound I-80 to Highway-12 also will be widened from one lane to two lanes.

For additional information: http://www.dot.ca.gov/dist4/projects/solano8068012/
Or follow Caltrans at: https://twitter.com/CaltransD4

Caltrans appreciates your patience as we work to improve California’s highways.
# # #

Tuesday, January 13, 2015

Caltrans Activates Ramp Meters on State Route 85

State of California • Department of Transportation

TRAFFIC ADVISORY

Today’s Date: January 13, 2015
District: 04-Oakland
Contact: Bernard Walik
Phone: (510) 286- 5705

FOR IMMEDIATE RELEASE

Caltrans Activates Ramp Meters on State Route 85

SANTA CLARA COUNTY — The California Department of Transportation (Caltrans) in partnership with Metropolitan Transportation Commission (MTC) and Santa Clara Valley Transportation Authority (VTA) will activate eight new on-ramp meters on northbound and seven new on-ramp meters on southbound State Route 85 between Interstate 280 in Cupertino and U.S. 101 in Mountain View.

Metering lights in the southbound direction will be activated for the P.M. peak commute hours of 3:00 p.m. to 7:00 p.m. on Wednesday, January 14. During this time, the lights will be set to solid green for one week then begin metering on January 21 during the P.M. peak hours.

Metering lights in the northbound direction will be activated for the A.M. peak commute hours from 6 a.m. to 11:00 a.m. on January 21. During this time, the lights will be set to solid green for one week then begin metering on January 28 during the A.M. peak hours.

Newly activated ramp locations could experience delays during the first few days of operation. Caltrans will monitor the metered on-ramps and make adjustments as they fine-tune the metering operations. The ramp metering information line phone number is 510-286-4531.

More information related to this project as well as updates can be viewed on the following website: http://www.dot.ca.gov/dist4/projects2/85rampmetering/ or follow us on Twitter at: https://twitter.com/CaltransD4


###

Friday, January 9, 2015

State Route 1-Between Muir Woods and Mill Valley-Marin Co.-Closure Update-January 9


State of California • Department of Transportation

TRAFFIC ADVISORY

Date: January 9, 2015
District: 4 - Oakland
Contact: Stephen Williams
Phone: (510) 286-6195

FOR IMMEDIATE RELEASE

State Route 1 Between Muir Woods and Mill Valley

• Marin County –Caltrans continues the road closure of Highway 1 in both directions between Muir Woods and Mill Valley. Caltrans cautions motorists, cyclists and pedestrians that the roadway is closed for safety reasons. Use the approved detour route and do not travel beyond barricades into closed area. Construction materials are being delivered, mobilization of heavy equipment has begun, and work will begin Monday, January 12, and continue from dawn to dusk, seven days a week, until the roadway is reopened.

Travelers should be aware that:

• Highway 1 has been closed to the public due to unsafe conditions—while the asphalt remains in-tact in the northbound direction, geotechnical engineers have determined that the fill material below the roadway is unstable and may collapse at any time. Caltrans asks that cyclists and pedestrians heed the “Road Closed” signs and follow the established detour until the roadway is repaired.
• The Panoramic Highway from Mill Valley to Stinson Beach is the established detour for this closure. The community and businesses at Muir Beach remain open and can be accessed via southbound Hwy 1 from Panoramic Highway.
• The repair will require construction of a soldier-pile retaining wall—this consists of a series of shafts drilled into the ground along the length of the wall, then steel beams are placed into the shafts and are backfilled with concrete. Timber-lagging is installed between the steel beams to create a retaining wall. The wall is then backfilled with soils or aggregate. The final step is repaving of the roadway.

Please drive cautiously through the detour route, watch for heavy construction equipment and leave a safe traveling distance between your vehicle and the vehicle ahead of you, and “Slow for the Cone Zone.”

For information about other Caltrans projects, visit the website at http://www.dot.ca.gov/dist4

###

Tuesday, January 6, 2015

State Route 29-Troutdale Creek Bridge Replacement-Prep Work Starts-Wk of January 6

State of California • Department of Transportation

TRAFFIC ADVISORY

Date: January 6, 2015
District: 4 - Oakland
Contact: Vince Jacala
Phone: (510) 286-5206

FOR IMMEDIATE RELEASE

State Route 29-Troutdale Creek Bridge Replacement Project
Preparation Work-Starts Week of January 6

NAPA COUNTY – The California Department of Transportation (Caltrans) is starting brush and tree removal work in preparation of the State Route 29 (SR-29)-Troutdale Creek Bridge Replacement Project in northwest Napa County.

One-Way Traffic Controls-Starts December 2014-January 2015
To ensure worker and public safety, one-way traffic controls will be in effect on SR-29 near the Troutdale Creek Bridge in Napa County beginning the week of January 6, 2015. The brush and tree removal will be completed in approximately 8 weeks after the work commences.

During one-way traffic controls, one lane of traffic will remain open at all times with flaggers alternating northbound and southbound traffic. Regular work hours are Monday-Friday from 8:00 AM until 3:30 PM each day.

All work is weather permitting. Motorists should allow for extra travel time.

SR-29 Troutdale Creek Bridge Project
Caltrans will replace the existing Troutdale Creek Bridge with a new bridge and widen the northbound and southbound SR-29 bridge approaches. The existing bridge must be replaced because of years of wear at its base from the Troutdale Creek. As part of the work, the bridge approaches will also be realigned to conform to the new bridge, and improve sight-lines for motorists. The project is scheduled to be completed as early as late 2016.

Additional project information will be posted on the Caltrans SR-29 Troutdale Creek Bridge project webpage at: http://www.dot.ca.gov/dist4/29troutdalecreek/

Or follow us on Twitter at: https://twitter.com/CaltransD4

Caltrans appreciate your patience as we work to maintain and improve California’s highways and bridges.
# # #

Monday, January 5, 2015

Interstate-680 -Near Marina Vista-Martinez-Overnight Lane Work Start 1-5-15


State of California • Department of Transportation

TRAFFIC ADVISORY


Date: January 5, 2015
District: 4 - Oakland
Contact: Allyn Amsk
Phone: (510) 286-5445

FOR IMMEDIATE RELEASE

Lane Closures Planned for
Interstate 680 Mococo Overhead Bridge Rehabilitation Project

Contra Costa County – This week Caltrans will work in the median on northbound and southbound Interstate 680 near the Marina Vista Avenue/Waterfront Road interchange. Due to traffic and concerns for worker safety, this work can only be completed at night.

Beginning Monday night, January 5 and continuing through Wednesday night, January 7, Caltrans will close one northbound lane from 8 p.m. to 5 a.m, and one southbound lane from 7 p.m. to 5 a.m.

If work is delayed due to weather conditions, it will be rescheduled for a later time. Please drive cautiously through the construction zone, follow the direction of flaggers, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone. The California Highway Patrol will be on site during these closures.

For more information about the project, please visit http://www.dot.ca.gov/dist4/projects/680mococo/

# # #

U.S. 101 On-Ramp Closures for Electrical Repair-Sonoma County-January 5 & 6


State of California • Department of Transportation

TRAFFIC ADVISORY

Date: January 5, 2015
District: 4 - Oakland
Contact: Allyn Amsk
Phone: (510) 286-5445

FOR IMMEDIATE RELEASE

Caltrans Schedules U.S. 101 On-Ramp Closures for Electrical Repair

SONOMA COUNTY – Caltrans has scheduled on-ramp closures for repair of ramp-metering equipment. Due to traffic and concerns for worker safety, this work can only be completed at night.

On-Ramp Closures for Week of January 5
• The 3rd Street on-ramp to southbound U.S. 101 will be closed Monday night, January 5, from 9 p.m. to 3 a.m.
• The Baker Avenue/Santa Rosa Avenue/Colgan Avenue on-ramp to northbound U.S. 101 will be closed Tuesday night, January 6, from 9 p.m. to 3 a.m.

If this work is delayed due to weather conditions, it will be rescheduled for a later time. Please drive cautiously through the construction zone and leave a safe traveling distance between your vehicle and the vehicle ahead of you. Please remember to Slow for the Cone Zone. The California Highway Patrol will be on site during these closures.

For more information about Caltrans projects in Sonoma County, visit the webpage at www.dot.ca.gov/dist4 and click on Sonoma County.

###