State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 31, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Laurel Street at I-780-Vallejo
I-780 Full Highway Closures-Ten Consecutive Nights
During Bridge Demolition
Starts Thursday, June 1, 2017 at 9:00 PM
SOLANO COUNTY – The California Department of Transportation (Caltrans) will demolish the Laurel Street Bridge above westbound and eastbound Interstate-780 (I-780) in Vallejo during ten consecutive nights of work.
Bridge demolition starts Thursday, June 1, 2017 at 9:00 PM and will be completed by the morning of Monday, June 12, 2017.
I-780 Overnight Full Highway Closures-during bridge demolition
To ensure worker and public safety, during night-time demolition work, eastbound and westbound I-780 will be closed at Laurel Street overnight with detours on I-780 in effect.
During weekday work, overnight I-780 closures start at 9:00 PM each night until 5:00 AM the following mornings.
During weekend work starting on Friday June 2nd, Saturday, June 3rd, Sunday, June 4th, Friday, June 9th and Saturday, June 10 closures start at 8:00 PM each night until 9:00 AM the following mornings.
Detours-Westbound I-780 to westbound/eastbound I-80, Curtola Parkway
Motorists traveling on westbound I-780 (from Benicia to Vallejo) will be detoured to exit I-780 at Glen Cove Road. Then proceed right onto northbound Glen Cove Road, left onto westbound Benicia Road, stay on Benicia Road for approximately 1½ miles, continue on westbound Benicia Road over the I-80/Benicia Road overcrossing, left onto southbound Lemon Street/ Motorists will then have the option to travel either right on westbound Curtola Parkway (towards Downtown Vallejo), or turn left onto eastbound Curtola Parkway to enter either westbound I-80 or eastbound I-80.
Detours-Eastbound Curtola Parkway to Eastbound I-780
Motorists traveling onto eastbound I-780 (from Downtown Vallejo to Benicia) will be detoured onto the exit loop off-ramp to eastbound I-80 from Curtola Parkway, stay left, then maintain the left lane toward the Frontage Road exit, right onto Lincoln Road East, then at the stop sign make an immediate left onto eastbound Benicia Road, continue on Benicia Road for approximately one-mile, right onto southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road.
Westbound and Eastbound I-80 to Eastbound I-780
Motorists traveling onto eastbound I-780 from westbound I-80 are advised to exit I-80 onto eastbound Benicia Road, southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road.
Detour signs will be posted. Motorists should expect delays. The CHP will assist with traffic controls. All work is weather dependent.
Laurel Street Bridge Closure-Long-Term Closure
The Laurel Street Bridge at I-780 was closed on Tuesday May 31, 2017. The bridge will remain closed continuously until demolition of the existing bridge and construction of a new bridge is completed by the end of 2017. Local detours are in effect.
Northbound Laurel Street Detour
During construction of the new Laurel Street Bridge, residents and businesses south of the bridge traveling north of the bridge will be detoured onto northbound Laurel Street, right onto Spruce Street, enter eastbound I-780 from Spruce Street, proceed on eastbound I-780, exit Glen Cove Road, enter westbound I-780 from Glen Cove Road, proceed on westbound I-780, exit Cedar Street into Laurel Street neighborhood.
*Southbound Laurel Street Detour
Residents and businesses north of the bridge traveling south of the bridge will be detoured onto southbound Laurel Street, left onto westbound Benicia Road (over the I-80 overcrossing), left onto southbound Lemon Street, left onto eastbound Curtola Parkway, then continue onto eastbound I-780 from Curtola Parkway, then exit eastbound I-780 at Spruce Street, right onto Spruce Street, then left onto Laurel Street.
*When I-780 is closed overnight, use westbound I-80 from Curtola Parkway, proceed on westbound I-80 and exit onto Magazine Street to access Laurel Street when traveling north of the bridge to south of the bridge.
*Motorists traveling from north of the bridge may also enter westbound or eastbound
I-80 or I-780 from Curtola Parkway.
For real-time traffic, click-on Caltrans Quick Maps: http://quickmap.dot.ca.gov/
Follow us on Twitter: https://twitter.com/caltransd4
Or for additional information, go to our project website: http://www.dot.ca.gov/d4/780laurelstreetbridge/
# # #
Caltrans District 4 - Working to bring you safe, efficient, accessible, and environmentally responsible highways and bridges in the Bay Area.
Wednesday, May 31, 2017
Friday, May 26, 2017
Laurel Street Bridge at I-780-Vallejo Long-Term Closure Starts Wed, May 31, 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 26, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Laurel Street Bridge At I-780-Vallejo
Long-Term Bridge Closure
Starts 9:00 AM Wednesday, May 31, 2017
Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will close the Laurel Street Bridge above westbound and eastbound Interstate-780 (I-780) in Vallejo for approximately eight months as crews demolish and rebuild the bridge at the same site.
The bridge will be closed starting Wednesday, May 31, 2017 at 9:00 AM.
After 9:00 AM on May 31, the bridge will be closed continuously until demolition of the existing bridge and construction of a new bridge is completed.
Northbound Laurel Street Detour
During construction of the new Laurel Street Bridge, residents and businesses south of the bridge traveling north of the bridge will be detoured onto northbound Laurel Street, right onto Spruce Street, enter eastbound I-780 from Spruce Street, proceed on eastbound I-780, exit Glen Cove Road, enter westbound I-780 from Glen Cove Road, proceed on westbound I-780, exit Cedar Street into Laurel Street neighborhood.
*Southbound Laurel Street Detour
Residents and businesses north of the bridge traveling south of the bridge will be detoured onto southbound Laurel Street, left onto westbound Benicia Road (over the I-80 overcrossing), left onto southbound Lemon Street, left onto eastbound Curtola Parkway, then continue onto eastbound I-780 from Curtola Parkway, then exit eastbound I-780 at Spruce Street, right onto Spruce Street, then left onto Laurel Street.
*When I-780 is closed overnight, use westbound I-80 from Curtola Parkway, proceed on westbound I-80 and exit onto Magazine Street to access Laurel Street when traveling north of the bridge to south of the bridge.
*Motorists traveling from north of the bridge may also enter westbound or eastbound
I-80 or I-780 from Curtola Parkway.
I-780 Overnight Full Highway Closures-during bridge demolition
Shortly after May 30, Caltrans will begin the demolition of the existing Laurel Street Bridge during approximately two weeks of overnight demolition work. During night-time demolition work, eastbound and westbound I-780 will be closed at Laurel Street overnight with detours on I-780 in effect.
Caltrans will make an announcement once detailed information is available regarding specific dates and times for bridge demolition.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional information about our I-780 Laurel Street Bridge Project, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s bridges and highways. Please #BeWorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: May 26, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Laurel Street Bridge At I-780-Vallejo
Long-Term Bridge Closure
Starts 9:00 AM Wednesday, May 31, 2017
Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will close the Laurel Street Bridge above westbound and eastbound Interstate-780 (I-780) in Vallejo for approximately eight months as crews demolish and rebuild the bridge at the same site.
The bridge will be closed starting Wednesday, May 31, 2017 at 9:00 AM.
After 9:00 AM on May 31, the bridge will be closed continuously until demolition of the existing bridge and construction of a new bridge is completed.
Northbound Laurel Street Detour
During construction of the new Laurel Street Bridge, residents and businesses south of the bridge traveling north of the bridge will be detoured onto northbound Laurel Street, right onto Spruce Street, enter eastbound I-780 from Spruce Street, proceed on eastbound I-780, exit Glen Cove Road, enter westbound I-780 from Glen Cove Road, proceed on westbound I-780, exit Cedar Street into Laurel Street neighborhood.
*Southbound Laurel Street Detour
Residents and businesses north of the bridge traveling south of the bridge will be detoured onto southbound Laurel Street, left onto westbound Benicia Road (over the I-80 overcrossing), left onto southbound Lemon Street, left onto eastbound Curtola Parkway, then continue onto eastbound I-780 from Curtola Parkway, then exit eastbound I-780 at Spruce Street, right onto Spruce Street, then left onto Laurel Street.
*When I-780 is closed overnight, use westbound I-80 from Curtola Parkway, proceed on westbound I-80 and exit onto Magazine Street to access Laurel Street when traveling north of the bridge to south of the bridge.
*Motorists traveling from north of the bridge may also enter westbound or eastbound
I-80 or I-780 from Curtola Parkway.
I-780 Overnight Full Highway Closures-during bridge demolition
Shortly after May 30, Caltrans will begin the demolition of the existing Laurel Street Bridge during approximately two weeks of overnight demolition work. During night-time demolition work, eastbound and westbound I-780 will be closed at Laurel Street overnight with detours on I-780 in effect.
Caltrans will make an announcement once detailed information is available regarding specific dates and times for bridge demolition.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional information about our I-780 Laurel Street Bridge Project, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s bridges and highways. Please #BeWorkZoneAlert.
# # #
Monday, May 22, 2017
SR-12 intermittent Day Closures between Rio Vista and Suisun City Starts 5-23-17
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 22, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
State Route 12-Center Divider Work
Intermittent Closures near Rio Vista
Three Consecutive Days Starting Tuesday, May 23
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin replacing damaged or missing center divider posts called “channelizers”, on State Route 12 (SR-12) between Rio Vista and Suisun City.
The “channelizers” have become worn and damaged over time. The three-day project starts Tuesday, May 23 and will be completed by Thursday, May 25.
Weather permitting, work will start each day Tuesday, May 23, Wednesday, May 24, and Thursday, May 25 at 9:00 AM and conclude at 3:00 PM.
Intermittent State Route-12 Closures:
To ensure public and worker safety, intermittent closures of State Route 12 (SR-12) between Drouin Drive and Shiloh Road are scheduled.
Crews will close the highway in both directions for 10 minutes at a time then reopen the highway to release traffic. CHP will help direct motorists in both eastbound and westbound directions. Motorists should expect delays and allow for extra travel time.
Please drive cautiously and leave a safe traveling distance between your vehicle and the vehicle ahead of you.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Or follow us on Twitter at: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain California’s highways.
###
TRAFFIC ADVISORY
Date: May 22, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
State Route 12-Center Divider Work
Intermittent Closures near Rio Vista
Three Consecutive Days Starting Tuesday, May 23
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin replacing damaged or missing center divider posts called “channelizers”, on State Route 12 (SR-12) between Rio Vista and Suisun City.
The “channelizers” have become worn and damaged over time. The three-day project starts Tuesday, May 23 and will be completed by Thursday, May 25.
Weather permitting, work will start each day Tuesday, May 23, Wednesday, May 24, and Thursday, May 25 at 9:00 AM and conclude at 3:00 PM.
Intermittent State Route-12 Closures:
To ensure public and worker safety, intermittent closures of State Route 12 (SR-12) between Drouin Drive and Shiloh Road are scheduled.
Crews will close the highway in both directions for 10 minutes at a time then reopen the highway to release traffic. CHP will help direct motorists in both eastbound and westbound directions. Motorists should expect delays and allow for extra travel time.
Please drive cautiously and leave a safe traveling distance between your vehicle and the vehicle ahead of you.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Or follow us on Twitter at: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain California’s highways.
###
Wednesday, May 17, 2017
Meridian Road Bridge AT I-80 Vacaville Long-Term Closure Starts May 19
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 16, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Meridian Road Bridge at I-80-Vacaville
Long-Term Bridge Closure
Starts 6:30 AM Friday, May 19, 2017
Overnight Closures on I-80
This Weekend
SOLANO COUNTY – The California Department of Transportation (Caltrans) will close the Interstate-80 (I-80) Meridian Road Bridge (Bridge #23-0147) continuously for approximately four months starting on Friday, May 19 at 6:30 AM. The bridge is located above westbound and eastbound I-80 in Vacaville.
The closure will allow Caltrans to perform bridge retrofit work which is scheduled to be completed in approximately four months. All work is weather permitting.
Long-Term Meridian Bridge Closure with Detours
During the long-term closure of the I-80 Meridian Road Bridge, nearby residents and businesses are advised to use the I-80 Midway Road Bridge just east of the Meridian Bridge as a general detour.
Westbound I-80 Overnight Closure and Detours
Saturday May 21-Sunday May 22
To ensure public and worker safety, during the one-night, partial demolition of the Meridian Bridge, a full overnight closure of westbound and eastbound I-80 between Meridian Road and Midway Road will be in effect Saturday, May 20 at 11:00 PM until Sunday, May 21 at 8:00 AM.
A short detour onto frontage roads near the bridge will be in effect. Detour signs will be posted. CHP will assist with traffic controls. \
Project Benefits
This project will retrofit the existing Meridian Road Bridge and will eventually demolish and rebuild the Midway Road Bridge. The work will seismically retrofit these bridges and bring them up to the latest seismic safety standards.
Online Information
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional information regarding our Caltrans I-80 Meridian Road Bridge and Midway Road Bridge Project, go to our project website at: http://www.dot.ca.gov/d4/80midwaymeridianbridge/index.html
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: May 16, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Meridian Road Bridge at I-80-Vacaville
Long-Term Bridge Closure
Starts 6:30 AM Friday, May 19, 2017
Overnight Closures on I-80
This Weekend
SOLANO COUNTY – The California Department of Transportation (Caltrans) will close the Interstate-80 (I-80) Meridian Road Bridge (Bridge #23-0147) continuously for approximately four months starting on Friday, May 19 at 6:30 AM. The bridge is located above westbound and eastbound I-80 in Vacaville.
The closure will allow Caltrans to perform bridge retrofit work which is scheduled to be completed in approximately four months. All work is weather permitting.
Long-Term Meridian Bridge Closure with Detours
During the long-term closure of the I-80 Meridian Road Bridge, nearby residents and businesses are advised to use the I-80 Midway Road Bridge just east of the Meridian Bridge as a general detour.
Westbound I-80 Overnight Closure and Detours
Saturday May 21-Sunday May 22
To ensure public and worker safety, during the one-night, partial demolition of the Meridian Bridge, a full overnight closure of westbound and eastbound I-80 between Meridian Road and Midway Road will be in effect Saturday, May 20 at 11:00 PM until Sunday, May 21 at 8:00 AM.
A short detour onto frontage roads near the bridge will be in effect. Detour signs will be posted. CHP will assist with traffic controls. \
Project Benefits
This project will retrofit the existing Meridian Road Bridge and will eventually demolish and rebuild the Midway Road Bridge. The work will seismically retrofit these bridges and bring them up to the latest seismic safety standards.
Online Information
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional information regarding our Caltrans I-80 Meridian Road Bridge and Midway Road Bridge Project, go to our project website at: http://www.dot.ca.gov/d4/80midwaymeridianbridge/index.html
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
SR85/Hwy101 in San Jose-Approach Slab Work- Overnight connector Closures Until June 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 17, 2017
District: 4 - Oakland
Contact: RocQuel Johnson
Phone: (510) 286-4948
FOR IMMEDIATE RELEASE
Storm Damage Repair Work on State Route 85 Connector –
May 22 2017 through mid-June 2017
Santa Clara County – Caltrans is conducting emergency storm damage repair work in San Jose to raise the approach slabs on the State Route (SR) 85 southbound High Occupancy Vehicle (HOV) connector to State Route 101 and the SR-85 northbound HOV connector to State Route 101. The work requires night closures due to heavy daytime traffic volumes through HOV connectors. The work will begin May 22, 2017 and continue through mid-June 2017. Hours of the closures are as follows:
• SR-85 southbound HOV connector to SR-101 will be closed nightly Mondays through Thursdays from 8:00 PM until 5:00 AM.
• SR-85 SB HOV to SR-101 will be closed Fridays from 8:00 PM until 9:00 AM.
• SR-85 SB HOV to SR-101 will be closed Saturdays from 6:00 PM until 10:00 AM.
• SR-85 SB HOV to SR-101 will be closed Sundays from 5:00 PM until 5:00 AM.
• SR-85 northbound HOV connector to SR-101 will be closed nightly Mondays through Thursdays from 7:00 PM until 5:00 AM.
• SR-85 NB HOV to SR-101 will be closed Fridays from 7:00 PM until 9:00 AM.
• SR-85 NB HOV to SR-101 will be closed Saturdays from 7:00 PM until 11:00 AM.
• SR-85 NB HOV to SR-101 will be closed Sundays from 8:00 PM until 5:00 AM
During the closures, motorists are to use SR-85 mainline. Traffic delays and construction noise may be associated with the closures. Closures will not take place over the Memorial Day weekend.
Motorists should drive with caution through the work zone. Get real-time traffic on Caltrans Quickmaps: http://quickmap.dot.ca.gov/. Or follow Caltrans on Twitter: http://twitter.com/CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
TRAFFIC ADVISORY
Date: May 17, 2017
District: 4 - Oakland
Contact: RocQuel Johnson
Phone: (510) 286-4948
FOR IMMEDIATE RELEASE
Storm Damage Repair Work on State Route 85 Connector –
May 22 2017 through mid-June 2017
Santa Clara County – Caltrans is conducting emergency storm damage repair work in San Jose to raise the approach slabs on the State Route (SR) 85 southbound High Occupancy Vehicle (HOV) connector to State Route 101 and the SR-85 northbound HOV connector to State Route 101. The work requires night closures due to heavy daytime traffic volumes through HOV connectors. The work will begin May 22, 2017 and continue through mid-June 2017. Hours of the closures are as follows:
• SR-85 southbound HOV connector to SR-101 will be closed nightly Mondays through Thursdays from 8:00 PM until 5:00 AM.
• SR-85 SB HOV to SR-101 will be closed Fridays from 8:00 PM until 9:00 AM.
• SR-85 SB HOV to SR-101 will be closed Saturdays from 6:00 PM until 10:00 AM.
• SR-85 SB HOV to SR-101 will be closed Sundays from 5:00 PM until 5:00 AM.
• SR-85 northbound HOV connector to SR-101 will be closed nightly Mondays through Thursdays from 7:00 PM until 5:00 AM.
• SR-85 NB HOV to SR-101 will be closed Fridays from 7:00 PM until 9:00 AM.
• SR-85 NB HOV to SR-101 will be closed Saturdays from 7:00 PM until 11:00 AM.
• SR-85 NB HOV to SR-101 will be closed Sundays from 8:00 PM until 5:00 AM
During the closures, motorists are to use SR-85 mainline. Traffic delays and construction noise may be associated with the closures. Closures will not take place over the Memorial Day weekend.
Motorists should drive with caution through the work zone. Get real-time traffic on Caltrans Quickmaps: http://quickmap.dot.ca.gov/. Or follow Caltrans on Twitter: http://twitter.com/CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
Tuesday, May 16, 2017
Real McCoy Ferry Overnght Maintenance Closure May 16 at 10:00 PM
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 16, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Overnight Maintenance Closure
Starts Tuesday, May 16, 2017 at 10:00 PM
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has scheduled an overnight closure of the Real McCoy Ferry on State Route (SR-84) to perform maintenance. The closure is scheduled starting Tuesday, May 16 at 10:00 PM until Wednesday, May 17 at 4:00 AM.
Overnight Detours-Use SR-84 Miner Slough Bridge
During the overnight closure of the Real McCoy Ferry on SR-84 and the ongoing closure of the J-Mack Ferry on SR-220, motorists traveling overnight between Ryer Island and Solano and Sacramento Counties are advised to use the Miner Slough Bridge on SR-84 as a detour.
J-Mack Ferry Closure Update
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
TRAFFIC ADVISORY
Date: May 16, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Overnight Maintenance Closure
Starts Tuesday, May 16, 2017 at 10:00 PM
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has scheduled an overnight closure of the Real McCoy Ferry on State Route (SR-84) to perform maintenance. The closure is scheduled starting Tuesday, May 16 at 10:00 PM until Wednesday, May 17 at 4:00 AM.
Overnight Detours-Use SR-84 Miner Slough Bridge
During the overnight closure of the Real McCoy Ferry on SR-84 and the ongoing closure of the J-Mack Ferry on SR-220, motorists traveling overnight between Ryer Island and Solano and Sacramento Counties are advised to use the Miner Slough Bridge on SR-84 as a detour.
J-Mack Ferry Closure Update
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
Wednesday, May 10, 2017
Real McCoy Ferry Overnight Maintenance Closure May 10 at 10PM until May 11 at 2AM
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 10, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Overnight Maintenance Closure
Starts Wednesday, May 10, 2017 at 10:00 PM
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has scheduled an overnight closure of the Real McCoy Ferry on State Route (SR-84) to perform preventive maintenance. The closure is scheduled starting Wednesday, May 10 at 10:00 PM until Thursday, May 11 at 2:00 AM.
Overnight Detours-Use SR-84 Miner Slough Bridge
During the overnight closure of the Real McCoy Ferry on SR-84 and the ongoing closure of the J-Mack Ferry on SR-220, motorists traveling overnight between Ryer Island and Solano and Sacramento Counties are advised to use the Miner Slough Bridge on SR-84 as a detour.
J-Mack Ferry Closure Update
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4 Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
TRAFFIC ADVISORY
Date: May 10, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Overnight Maintenance Closure
Starts Wednesday, May 10, 2017 at 10:00 PM
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has scheduled an overnight closure of the Real McCoy Ferry on State Route (SR-84) to perform preventive maintenance. The closure is scheduled starting Wednesday, May 10 at 10:00 PM until Thursday, May 11 at 2:00 AM.
Overnight Detours-Use SR-84 Miner Slough Bridge
During the overnight closure of the Real McCoy Ferry on SR-84 and the ongoing closure of the J-Mack Ferry on SR-220, motorists traveling overnight between Ryer Island and Solano and Sacramento Counties are advised to use the Miner Slough Bridge on SR-84 as a detour.
J-Mack Ferry Closure Update
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4 Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
Tuesday, May 9, 2017
Westbound I-780 Overnight Closure-Vallejo Starts May at 10:00 PM
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 8, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate 780 at Laurel Street-Vallejo
Overnight Full Highway Closure
Starts 10:00 PM Tuesday, May 9, 2017
Prep Work for Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin installing concrete safety barriers on eastbound and westbound Interstate-780 (I-780) in Vallejo as part of the I-780 Laurel Street Bridge Project.
The long-term project will demolish and rebuild the I-780 Laurel Street Bridge over a period of approximately eight months.
This preliminary work in preparation of bridge demolition is scheduled to start Tuesday, the night of Tuesday, May 9, 2017. All work is weather permitting.
Westbound I-780 Overnight Closure- Tuesday May 9
Detour Starts at Glen Cove Road
To ensure public and worker safety, a full overnight closure of westbound I-780 between Glen Cove Road and the I-80/I-780 Interchange will be in effect Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM.
Motorists traveling on westbound I-780 (from Benicia to Vallejo) will exit westbound
I-780 at Glen Cove Road, proceed on northbound Glen Cove Road, westbound Benicia Road, southbound Lemon Street and onto Curtola Parkway where motorists can either enter westbound or eastbound I-80 or proceed westbound on Curtola Parkway towards Downtown Vallejo.
Detour signs will be posted. CHP will assist with traffic controls.
Eastbound I-780 Lane Reductions
One of two lanes of eastbound I-780 between Glen Cove Road and the I-780/I-80 Interchange will be closed on two consecutive nights Tuesday, May 9 and Wednesday May 10 starting each night at 9:00 PM until 5:00 AM the following mornings. One lane of eastbound I-780 will remain open at all times.
Eastbound and Westbound I-80 to Eastbound I-780 Connector Closure:
The connectors from eastbound and westbound Interstate-80 (I-80) to eastbound I-780 will be closed Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM. Motorists traveling from westbound and eastbound I-80 to eastbound I-780 (from Vallejo to Benicia) will be detoured to eastbound Benicia Road, southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road. Detour signs will be posted.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional about our I-780 Laurel Street Bridge Project information, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: May 8, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate 780 at Laurel Street-Vallejo
Overnight Full Highway Closure
Starts 10:00 PM Tuesday, May 9, 2017
Prep Work for Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin installing concrete safety barriers on eastbound and westbound Interstate-780 (I-780) in Vallejo as part of the I-780 Laurel Street Bridge Project.
The long-term project will demolish and rebuild the I-780 Laurel Street Bridge over a period of approximately eight months.
This preliminary work in preparation of bridge demolition is scheduled to start Tuesday, the night of Tuesday, May 9, 2017. All work is weather permitting.
Westbound I-780 Overnight Closure- Tuesday May 9
Detour Starts at Glen Cove Road
To ensure public and worker safety, a full overnight closure of westbound I-780 between Glen Cove Road and the I-80/I-780 Interchange will be in effect Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM.
Motorists traveling on westbound I-780 (from Benicia to Vallejo) will exit westbound
I-780 at Glen Cove Road, proceed on northbound Glen Cove Road, westbound Benicia Road, southbound Lemon Street and onto Curtola Parkway where motorists can either enter westbound or eastbound I-80 or proceed westbound on Curtola Parkway towards Downtown Vallejo.
Detour signs will be posted. CHP will assist with traffic controls.
Eastbound I-780 Lane Reductions
One of two lanes of eastbound I-780 between Glen Cove Road and the I-780/I-80 Interchange will be closed on two consecutive nights Tuesday, May 9 and Wednesday May 10 starting each night at 9:00 PM until 5:00 AM the following mornings. One lane of eastbound I-780 will remain open at all times.
Eastbound and Westbound I-80 to Eastbound I-780 Connector Closure:
The connectors from eastbound and westbound Interstate-80 (I-80) to eastbound I-780 will be closed Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM. Motorists traveling from westbound and eastbound I-80 to eastbound I-780 (from Vallejo to Benicia) will be detoured to eastbound Benicia Road, southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road. Detour signs will be posted.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional about our I-780 Laurel Street Bridge Project information, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
Real McCoy Ferry Returned to Service
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 9, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Returned to Service
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has returned the Real McCoy Ferry on State Route (SR-84) to service after completing emergency repairs to the boat’s engines.
The Real McCoy returned to service at approximately 8:00 PM on Thursday, May 8, 2017.
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
TRAFFIC ADVISORY
Date: May 9, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy Ferry Returned to Service
J-Mack Ferry Remains Closed
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has returned the Real McCoy Ferry on State Route (SR-84) to service after completing emergency repairs to the boat’s engines.
The Real McCoy returned to service at approximately 8:00 PM on Thursday, May 8, 2017.
The J-Mack Ferry on State Route 220 (SR-220) remains closed until further notice due to emergency repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
Monday, May 8, 2017
Real McCoy & J-Mack Ferries Closed Until Further Notice-Emergency Repairs
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 8, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy II and J-Mack Ferries
Closed Until Further Notice
Due to Emergency Repairs-Use Miner Slough Bridge as Detour
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has suspended service of the Real McCoy and the J-Mack ferries until further notice.
The Real McCoy Ferry on State Route 84 (SR-84) and the J-Mack Ferry on State Route 220 (SR-220) will be closed until further notice due to emergency repairs to the Real McCoy’s engines and long-term repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
During the closure of the Real McCoy and J-Mack ferries, motorists are advised to use the Miner Slough Bridge on SR-84 as a detour when traveling between Ryer Island and Sacramento and Solano Counties.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
TRAFFIC ADVISORY
Date: May 8, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Real McCoy II and J-Mack Ferries
Closed Until Further Notice
Due to Emergency Repairs-Use Miner Slough Bridge as Detour
Check Ferry Update Line for Latest Updates
SOLANO COUNTY– The California Department of Transportation (Caltrans) has suspended service of the Real McCoy and the J-Mack ferries until further notice.
The Real McCoy Ferry on State Route 84 (SR-84) and the J-Mack Ferry on State Route 220 (SR-220) will be closed until further notice due to emergency repairs to the Real McCoy’s engines and long-term repairs to the J-Mack’s underwater cable and required inspections by the U.S. Coast Guard.
During the closure of the Real McCoy and J-Mack ferries, motorists are advised to use the Miner Slough Bridge on SR-84 as a detour when traveling between Ryer Island and Sacramento and Solano Counties.
For the latest information, call the Caltrans Ferry Update Line at (510) 622-0120.
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBay
Or follow us on Twitter: https://twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the Delta ferries.
# # #
Friday, May 5, 2017
Westbound I-780 Full Overnight Closures- Vallejo -Tues, May 9
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: May 5, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate 780 at Laurel Street-Vallejo
Overnight Full Highway Closure
Starts 10:00 PM Tuesday, May 9, 2017
Prep Work for Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin installing concrete safety barriers on eastbound and westbound Interstate-780 (I-780) in Vallejo as part of the I-780 Laurel Street Bridge Project.
The long-term project will demolish and rebuild the I-780 Laurel Street Bridge over a period of approximately eight months.
This preliminary work in preparation of bridge demolition is scheduled to start Tuesday, the night of Tuesday, May 9, 2017. All work is weather permitting.
Westbound I-780 Overnight Closure- Tuesday May 9
Detour Starts at Glen Cove Road
To ensure public and worker safety, a full overnight closure of westbound I-780 between Glen Cove Road and the I-80/I-780 Interchange will be in effect Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM.
Motorists traveling on westbound I-780 (from Benicia to Vallejo) will exit westbound
I-780 at Glen Cove Road, proceed on northbound Glen Cove Road, westbound Benicia Road, southbound Lemon Street and onto Curtola Parkway where motorists can either enter westbound or eastbound I-80 or proceed westbound on Curtola Parkway towards Downtown Vallejo.
Detour signs will be posted. CHP will assist with traffic controls.
Eastbound I-780 Lane Reductions
One of two lanes of eastbound I-780 between Glen Cove Road and the I-780/I-80 Interchange will be closed on two consecutive nights Tuesday, May 9 and Wednesday May 10 starting each night at 9:00 PM until 5:00 AM the following mornings. One lane of eastbound I-780 will remain open at all times.
Eastbound and Westbound I-80 to Eastbound I-780 Connector Closure:
The connectors from eastbound and westbound Interstate-80 (I-80) to eastbound I-780 will be closed Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM. Motorists traveling from westbound and eastbound I-80 to eastbound I-780 (from Vallejo to Benicia) will be detoured to eastbound Benicia Road, southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road. Detour signs will be posted.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional about our I-780 Laurel Street Bridge Project information, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
TRAFFIC ADVISORY
Date: May 5, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
Westbound Interstate 780 at Laurel Street-Vallejo
Overnight Full Highway Closure
Starts 10:00 PM Tuesday, May 9, 2017
Prep Work for Upcoming Bridge Demolition
SOLANO COUNTY – The California Department of Transportation (Caltrans) will begin installing concrete safety barriers on eastbound and westbound Interstate-780 (I-780) in Vallejo as part of the I-780 Laurel Street Bridge Project.
The long-term project will demolish and rebuild the I-780 Laurel Street Bridge over a period of approximately eight months.
This preliminary work in preparation of bridge demolition is scheduled to start Tuesday, the night of Tuesday, May 9, 2017. All work is weather permitting.
Westbound I-780 Overnight Closure- Tuesday May 9
Detour Starts at Glen Cove Road
To ensure public and worker safety, a full overnight closure of westbound I-780 between Glen Cove Road and the I-80/I-780 Interchange will be in effect Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM.
Motorists traveling on westbound I-780 (from Benicia to Vallejo) will exit westbound
I-780 at Glen Cove Road, proceed on northbound Glen Cove Road, westbound Benicia Road, southbound Lemon Street and onto Curtola Parkway where motorists can either enter westbound or eastbound I-80 or proceed westbound on Curtola Parkway towards Downtown Vallejo.
Detour signs will be posted. CHP will assist with traffic controls.
Eastbound I-780 Lane Reductions
One of two lanes of eastbound I-780 between Glen Cove Road and the I-780/I-80 Interchange will be closed on two consecutive nights Tuesday, May 9 and Wednesday May 10 starting each night at 9:00 PM until 5:00 AM the following mornings. One lane of eastbound I-780 will remain open at all times.
Eastbound and Westbound I-80 to Eastbound I-780 Connector Closure:
The connectors from eastbound and westbound Interstate-80 (I-80) to eastbound I-780 will be closed Tuesday, May 9 at 10:00 PM until Wednesday, May 10 at 5:00 AM. Motorists traveling from westbound and eastbound I-80 to eastbound I-780 (from Vallejo to Benicia) will be detoured to eastbound Benicia Road, southbound Glen Cove Road and enter eastbound I-780 from Glen Cove Road. Detour signs will be posted.
For real-time traffic, click-on Caltrans Quick Maps at: http://quickmap.dot.ca.gov/
Follow us on Twitter at: https://twitter.com/caltransd4
Or for additional about our I-780 Laurel Street Bridge Project information, go to our project website at: http://www.dot.ca.gov/d4/780laurelstreetbridge/
Caltrans appreciates your patience as we work to maintain California’s highways and bridges. Please #BeWorkZoneAlert.
# # #
Subscribe to:
Posts (Atom)