State of California • Department of Transportation
TRAFFIC ADVISORY
Date: August 15, 2017
District: 4-Oakland
Contact: Vince Jacala
Vince.jacala@dot.ca.gov
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Meridian Bridge At I-80 in Vacaville Reopens
Tuesday, August 15, 2017
Midway Bridge At I-80 in Dixon Closes
Wednesday, September 6, 2017
Overnight I-80 Full Highway Closures During Midway Bridge Demolition
SOLANO COUNTY— The California Department of Transportation (Caltrans) has completed its retrofit work on the Interstate-80 (I-80) Meridian Road Bridge and is scheduled to reopen the Meridian Bridge at approximately 6:00 PM on Tuesday, August 15, 2017.
After reopening the Meridian Bridge, Caltrans will shift work to the I-80 Midway Road Bridge and start the long-term closure of the Midway Bridge on Wednesday, September 6, 2017.
Both bridges are located above eastbound and westbound I-80 in and near the cities of Vacaville and Dixon in rural Solano County.
Midway Bridge To Close For Demolition and Rebuild -Starting September 6, 2017
Caltrans will completely CLOSE the I-80 Midway Road Bridge starting the morning of September 6 in preparation of its demolition and rebuild. Caltrans will release a more specific closure time as soon as additional information is available. The Midway Bridge will remain CLOSED until the new Midway Bridge is completed as early as spring 2018.
Project Benefits
This project retrofits the existing Meridian Road Bridge and will demolish and rebuild the Midway Road Bridge. The work seismically retrofits these bridges and brings them up to the latest seismic safety standards.
Midway Road Bridge Closure-Detour Routes
Shortly after the Meridian Road Bridge is reopened, Midway Road Bridge across I-80 will be closed continuously until spring-summer 2018. During the construction of the new Midway Road Bridge, the Meridian Road Bridge above I-80 and just west of the Midway Road Bridge will remain OPEN and serve as a general detour.
I-80 Overnight Full Highway Closure-Overnight September 9, 2017
During the demolition of the Midway Road Bridge starting the night of September 9, 2017 until the morning of September 10, 2017, eastbound and westbound I-80 will be closed overnight at Midway Road. A short detour onto frontage roads near the bridge will be in effect. Caltrans will release more detailed times as soon as additional information is available.
All work is weather dependent.
Motorists should expect delays and watch for detours signs and flaggers. The CHP will assist with traffic controls.
Construction Zone Activity
Residents and businesses near the Midway Bridge may temporarily experience increased construction noise.
Get additional project information:
Follow us on Twitter: https://twitter.com/Caltrans
Get 24/7 traffic updates on 511.org: https://twitter.com/511SFBAY
Or see our Caltrans I-80 Meridian/Midway Road Bridges Project website: http://www.dot.ca.gov/d4/80midwaymeridianbridge/
Caltrans thanks you for your patience as we work to maintain California’s highways and bridges.
Please #BeWorkZoneAlert
###
Caltrans District 4 - Working to bring you safe, efficient, accessible, and environmentally responsible highways and bridges in the Bay Area.
Monday, August 14, 2017
Friday, August 11, 2017
State Route 37-Overnight Reduced Traffic Lanes During Pavement Repair-Starts Sun August 13, 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: August 11, 2017
District: 4-Oakland
Contact: Vince Jacala
Vince.jacala@dot.ca.gov
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
State Route 37
Between Skaggs Island and State Route 121
Five Consecutive Nights of Pavement Repair
Reduced Traffic Lanes-Expect Delays
Starts Sunday, August 13, 2017
SOLANO COUNTY— The California Department of Transportation (Caltrans) will perform major pavement repair on State Route 37 (SR-37) between Skaggs Island and just west of State Route 121 (SR-121) in rural Solano County near the Solano-Sonoma County Line.
Overnight One-Way Traffic Controls-Start August 13
The five consecutive nights of work is scheduled to start on Sunday, August 13 until the morning of Friday, August 18. Work will start each night at 9:00 PM until 5:00 AM the following mornings.
Although no full highway closures are scheduled, motorists may experience delays as Caltrans repairs and repaves SR-37 with one-way traffic controls. This will allow one lane on SR-37 to remain open.
During one-way traffic controls, crews will alternate traffic in the eastbound and westbound directions. Motorists are advised to watch for slow traffic and flaggers. The California Highway Patrol (CHP) will also help direct motorists. All work is weather permitting.
Traffic Updates
For real-time traffic, click on Caltrans Quick Maps at: http://quickmap.dot.ca.gov
Or follow us on Twitter: https://twitter.com/Caltrans
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBAY
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please #BeWorkZoneAlert
###
TRAFFIC ADVISORY
Date: August 11, 2017
District: 4-Oakland
Contact: Vince Jacala
Vince.jacala@dot.ca.gov
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
State Route 37
Between Skaggs Island and State Route 121
Five Consecutive Nights of Pavement Repair
Reduced Traffic Lanes-Expect Delays
Starts Sunday, August 13, 2017
SOLANO COUNTY— The California Department of Transportation (Caltrans) will perform major pavement repair on State Route 37 (SR-37) between Skaggs Island and just west of State Route 121 (SR-121) in rural Solano County near the Solano-Sonoma County Line.
Overnight One-Way Traffic Controls-Start August 13
The five consecutive nights of work is scheduled to start on Sunday, August 13 until the morning of Friday, August 18. Work will start each night at 9:00 PM until 5:00 AM the following mornings.
Although no full highway closures are scheduled, motorists may experience delays as Caltrans repairs and repaves SR-37 with one-way traffic controls. This will allow one lane on SR-37 to remain open.
During one-way traffic controls, crews will alternate traffic in the eastbound and westbound directions. Motorists are advised to watch for slow traffic and flaggers. The California Highway Patrol (CHP) will also help direct motorists. All work is weather permitting.
Traffic Updates
For real-time traffic, click on Caltrans Quick Maps at: http://quickmap.dot.ca.gov
Or follow us on Twitter: https://twitter.com/Caltrans
You can also get 24/7 traffic updates on 511.org: https://twitter.com/511SFBAY
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please #BeWorkZoneAlert
###
J-Mack Ferry Underwater Cable Replacement- Weekend Morning Closure August 12 btwn 5AM-12PM
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: August 11, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
J-Mack Ferry-Underwater Cable Replacement
Weekend Morning Closure
Saturday, August 12, 2017 starting at 5:00 AM
SOLANO COUNTY – The California Department of Transportation (Caltrans) will temporarily close the J-Mack Ferry on State Route 220 (SR-220) in the Delta early Saturday morning to replace the underwater cable which the ferry runs on.
The J-Mack is scheduled to close starting Saturday, August 12 at 5:00 AM until 12:00 PM that same day.
The J-Mack Ferry runs on a cable across Steamboat Slough between Ryer Island in Solano County and Sacramento County.
The J-Mack, provides around the clock service on SR-220.
During the closure, motorists are advised to use the Real McCoy Ferry, also known as the Cache Slough Ferry along State Route 84 (SR-84) or the Miner Slough Bridge on SR-84.
For the latest, please call the Caltrans Ryer Island Ferry Update Line at (510) 622-0120.
Additional information is also available on the Caltrans Delta Ferries webpage at:
http://www.dot.ca.gov/dist4/deltaferries/
Or follow Caltrans on Twitter at: https://mobile.twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the J-Mack Ferry.
# # #
TRAFFIC ADVISORY
Date: August 11, 2017
District: 4 - Oakland
Contact: Vince Jacala
Phone: 510/286-5206
FOR IMMEDIATE RELEASE
J-Mack Ferry-Underwater Cable Replacement
Weekend Morning Closure
Saturday, August 12, 2017 starting at 5:00 AM
SOLANO COUNTY – The California Department of Transportation (Caltrans) will temporarily close the J-Mack Ferry on State Route 220 (SR-220) in the Delta early Saturday morning to replace the underwater cable which the ferry runs on.
The J-Mack is scheduled to close starting Saturday, August 12 at 5:00 AM until 12:00 PM that same day.
The J-Mack Ferry runs on a cable across Steamboat Slough between Ryer Island in Solano County and Sacramento County.
The J-Mack, provides around the clock service on SR-220.
During the closure, motorists are advised to use the Real McCoy Ferry, also known as the Cache Slough Ferry along State Route 84 (SR-84) or the Miner Slough Bridge on SR-84.
For the latest, please call the Caltrans Ryer Island Ferry Update Line at (510) 622-0120.
Additional information is also available on the Caltrans Delta Ferries webpage at:
http://www.dot.ca.gov/dist4/deltaferries/
Or follow Caltrans on Twitter at: https://mobile.twitter.com/CaltransD4
Caltrans appreciates your patience as we work to maintain the J-Mack Ferry.
# # #
Monday, August 7, 2017
I-80 Meridian Bridge Reopening & I-80 Midway Bridge to Close-Mid-Late August 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: August 7, 2017
District: 4-Oakland
Contact: Vince Jacala
Vince.jacala@dot.ca.gov
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Meridian Bridge At I-80 Reopening
Midway Bridge At I-80 Closing
Vacaville and Dixon
Overnight I-80 Full Highway Closures During Midway Bridge Demolition
Mid-August 2017
SOLANO COUNTY— The California Department of Transportation (Caltrans) is nearing completion of its retrofit work on the Interstate-80 (I-80) Meridian Road Bridge and will soon be reopening the Meridian Road Bridge and shifting work to the I-80 Midway Road Bridge.
Both bridges are located above eastbound and westbound I-80 in and near the cities of Vacaville and Dixon in rural Solano County.
Meridian Bridge Reopens-Summer 2017
Caltrans is tentatively scheduled to complete its work at the I-80 Meridian Road Bridge and reopen Meridian Bridge as early as mid August 2017.
Midway Bridge To Close For Demolition and Rebuid-Summer 2017
Shortly after the Meridian Bridge is reopened, Caltrans will completely CLOSE the I-80 Midway Road Bridge, demolish Midway Bridge and rebuild it. The temporary closure of the Midway Bridge is tentatively scheduled to begin as early as mid-late August. The Midway Bridge will remain CLOSED until construction of the new Midway Bridge is completed as early as spring 2018.
Project Benefits
This project retrofits the existing Meridian Road Bridge and will demolish and rebuild the Midway Road Bridge. The work seismically retrofits these bridges and brings them up to the latest seismic safety standards.
Midway Road Bridge Closure-Detour Routes
After Meridian Road Bridge is reopened, Midway Road across I-80 will be closed continuously until spring-summer 2018. During the construction of the new Midway Road Bridge, the Meridian Road Bridge above I-80 and just west of the Midway Road Bridge will remain OPEN and serve as a general detour.
I-80 Overnight Full Highway Closure-Mid August 2017
During the demolition of the Midway Road Bridge, eastbound and westbound I-80 will be closed overnight at Midway Road. A short detour onto frontage roads near the bridge will be in effect. The overnight I-80 closures are tentatively scheduled in Mid-Late August 2017. Caltrans will release additional information as more detailed dates and times are availalble.
All work is weather dependent.
Motorists should expect delays and watch for detours signs and flaggers. The CHP will assist with traffic controls.
Construction Zone Activity
Residents and businesses near the Midway Bridge may temporarily experience increased construction noise.
Get additional project information:
Follow us on Twitter: https://twitter.com/Caltrans
Get 24/7 traffic updates on 511.org: https://twitter.com/511SFBAY
Or see our Caltrans I-80 Meridian/Midway Road Bridges Project website: http://www.dot.ca.gov/d4/80midwaymeridianbridge/
Caltrans thanks you for your patience as we work to maintain California’s highways and bridges.
Please #BeWorkZoneAlert
###
TRAFFIC ADVISORY
Date: August 7, 2017
District: 4-Oakland
Contact: Vince Jacala
Vince.jacala@dot.ca.gov
Phone: (510) 286-5206
FOR IMMEDIATE RELEASE
Meridian Bridge At I-80 Reopening
Midway Bridge At I-80 Closing
Vacaville and Dixon
Overnight I-80 Full Highway Closures During Midway Bridge Demolition
Mid-August 2017
SOLANO COUNTY— The California Department of Transportation (Caltrans) is nearing completion of its retrofit work on the Interstate-80 (I-80) Meridian Road Bridge and will soon be reopening the Meridian Road Bridge and shifting work to the I-80 Midway Road Bridge.
Both bridges are located above eastbound and westbound I-80 in and near the cities of Vacaville and Dixon in rural Solano County.
Meridian Bridge Reopens-Summer 2017
Caltrans is tentatively scheduled to complete its work at the I-80 Meridian Road Bridge and reopen Meridian Bridge as early as mid August 2017.
Midway Bridge To Close For Demolition and Rebuid-Summer 2017
Shortly after the Meridian Bridge is reopened, Caltrans will completely CLOSE the I-80 Midway Road Bridge, demolish Midway Bridge and rebuild it. The temporary closure of the Midway Bridge is tentatively scheduled to begin as early as mid-late August. The Midway Bridge will remain CLOSED until construction of the new Midway Bridge is completed as early as spring 2018.
Project Benefits
This project retrofits the existing Meridian Road Bridge and will demolish and rebuild the Midway Road Bridge. The work seismically retrofits these bridges and brings them up to the latest seismic safety standards.
Midway Road Bridge Closure-Detour Routes
After Meridian Road Bridge is reopened, Midway Road across I-80 will be closed continuously until spring-summer 2018. During the construction of the new Midway Road Bridge, the Meridian Road Bridge above I-80 and just west of the Midway Road Bridge will remain OPEN and serve as a general detour.
I-80 Overnight Full Highway Closure-Mid August 2017
During the demolition of the Midway Road Bridge, eastbound and westbound I-80 will be closed overnight at Midway Road. A short detour onto frontage roads near the bridge will be in effect. The overnight I-80 closures are tentatively scheduled in Mid-Late August 2017. Caltrans will release additional information as more detailed dates and times are availalble.
All work is weather dependent.
Motorists should expect delays and watch for detours signs and flaggers. The CHP will assist with traffic controls.
Construction Zone Activity
Residents and businesses near the Midway Bridge may temporarily experience increased construction noise.
Get additional project information:
Follow us on Twitter: https://twitter.com/Caltrans
Get 24/7 traffic updates on 511.org: https://twitter.com/511SFBAY
Or see our Caltrans I-80 Meridian/Midway Road Bridges Project website: http://www.dot.ca.gov/d4/80midwaymeridianbridge/
Caltrans thanks you for your patience as we work to maintain California’s highways and bridges.
Please #BeWorkZoneAlert
###
State Route 37 in Marin County-Reduced Lanes Overnight during bridge work Until September 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: August 4, 2017
District: 4-Oakland
Contact: Steve Williams
Phone: (510) 286-6195
FOR IMMEDIATE RELEASE
Highway 37- Novato
Bridge Deck Resurfacing Project
Overnight Lane Closures
Starts Sunday, August 6, 2017
MARIN COUNTY— The California Department of Transportation (Caltrans) is scheduled to start resurfacing the bridge decks on Highway 37 in Marin at Novato Creek and Petaluma River this Sunday.
The project consists of grinding off the old asphalt, repairing the concrete deck and place ment of a new polyester concrete deck.
The anticipated completion date for this work as scheduled is no later than the first week of September. There will be single night time lane closures as indicated in the schedule below motorists may experience minor delays. All work is weather permitting.
• Sun 8/6 – Work at Novato Creek Bridge: WB #1 lane 8 p.m. to 6 a.m. EB #1 lane 8 p.m. to 11 a.m.
• Mon 8/7 – Work at Novato Creek Bridge: WB #2 lane 8 p.m. to 6 a.m. EB #2 lane 8 p.m. to 11 a.m.
• Tue 8/8 – Work at Petaluma River Bridge: WB #1 lane 8 p.m. to 6 a.m.
• Wed 8/9 – Work at Petaluma River Bridge: EB #1 lane 8 p.m. to 11 a.m.
• Thurs 8/10 – Work at Petaluma River Bridge: WB #2 lane 8 p.m. to 6 a.m.
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please #BeWorkZoneAlert
###
TRAFFIC ADVISORY
Date: August 4, 2017
District: 4-Oakland
Contact: Steve Williams
Phone: (510) 286-6195
FOR IMMEDIATE RELEASE
Highway 37- Novato
Bridge Deck Resurfacing Project
Overnight Lane Closures
Starts Sunday, August 6, 2017
MARIN COUNTY— The California Department of Transportation (Caltrans) is scheduled to start resurfacing the bridge decks on Highway 37 in Marin at Novato Creek and Petaluma River this Sunday.
The project consists of grinding off the old asphalt, repairing the concrete deck and place ment of a new polyester concrete deck.
The anticipated completion date for this work as scheduled is no later than the first week of September. There will be single night time lane closures as indicated in the schedule below motorists may experience minor delays. All work is weather permitting.
• Sun 8/6 – Work at Novato Creek Bridge: WB #1 lane 8 p.m. to 6 a.m. EB #1 lane 8 p.m. to 11 a.m.
• Mon 8/7 – Work at Novato Creek Bridge: WB #2 lane 8 p.m. to 6 a.m. EB #2 lane 8 p.m. to 11 a.m.
• Tue 8/8 – Work at Petaluma River Bridge: WB #1 lane 8 p.m. to 6 a.m.
• Wed 8/9 – Work at Petaluma River Bridge: EB #1 lane 8 p.m. to 11 a.m.
• Thurs 8/10 – Work at Petaluma River Bridge: WB #2 lane 8 p.m. to 6 a.m.
Caltrans thanks you for your patience as we work to maintain California’s highways.
Please #BeWorkZoneAlert
###
Tuesday, August 1, 2017
Overnight Ramp and Lane Closures I-880 In Oakland July 31-August 5, 2017
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: July 31, 2017
District: 4 - Oakland
Contact: Chiconda V Davis
Phone: (510) 286-1227
FOR IMMEDIATE RELEASE
OVERNIGHT RAMP and LANE CLOSURES
NORTHBOUND/SOUTHBOUND INTERSTATE 880 AT VARIOUS LOCATIONS
IN OAKLAND
JULY 31 THROUGH AUGUST 5, 2017
Oakland/Alameda, Alameda County – The California Department of Transportation (Caltrans) has scheduled various lane closures and full freeway closure of northbound (NB) and southbound (SB) of Interstate 880 (I-880) from 5th Avenue to High Street in Oakland starting Monday, July 31 through Saturday, August 5, 2017, at various times and location to continue the removal of the steel girders and bridge overcrossing at the 23rd Avenue Overcrossing.
Closure information is as follows:
• Monday July 31st to Tuesday August 1st: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2 closed
• Tuesday August 1st to Wednesday August 2nd: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2; NB 29th Avenue on-ramp to I-880
• Wednesday August 2nd to Thursday August 3rd: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2; NB 29th Avenue on-ramp to I-880; full NB closure at 23rd Avenue overcrossing
• Friday August 4th to Saturday August 5th: from 10:00 PM until 7:00 AM: NB lane closures at various location along I-880 between 5th Avenue and High Street
Advance warning changeable message signs, detour signs and construction crew flaggers will be in place to assist motorists traveling in the area.
This work is weather dependent and will be rescheduled if necessary. Motorists are advised to expect delays and allow extra time for their commute. Please drive with caution through the construction zone, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.
California Highway Patrol will be on site during night closures.
For more information about this Caltrans construction project, visit the website at: http://www.dot.ca.gov/dist4/projects/88023rd29thovercrossing/
Closure information and real-time traffic maybe found on Caltrans QuickMap: http://quickmap.dot.ca.gov/.
Follow us on Twitter: @CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
TRAFFIC ADVISORY
Date: July 31, 2017
District: 4 - Oakland
Contact: Chiconda V Davis
Phone: (510) 286-1227
FOR IMMEDIATE RELEASE
OVERNIGHT RAMP and LANE CLOSURES
NORTHBOUND/SOUTHBOUND INTERSTATE 880 AT VARIOUS LOCATIONS
IN OAKLAND
JULY 31 THROUGH AUGUST 5, 2017
Oakland/Alameda, Alameda County – The California Department of Transportation (Caltrans) has scheduled various lane closures and full freeway closure of northbound (NB) and southbound (SB) of Interstate 880 (I-880) from 5th Avenue to High Street in Oakland starting Monday, July 31 through Saturday, August 5, 2017, at various times and location to continue the removal of the steel girders and bridge overcrossing at the 23rd Avenue Overcrossing.
Closure information is as follows:
• Monday July 31st to Tuesday August 1st: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2 closed
• Tuesday August 1st to Wednesday August 2nd: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2; NB 29th Avenue on-ramp to I-880
• Wednesday August 2nd to Thursday August 3rd: from 10:00 PM until 5:00 AM: from 5th Avenue to High Street SB lanes #1 and #2; NB 29th Avenue on-ramp to I-880; full NB closure at 23rd Avenue overcrossing
• Friday August 4th to Saturday August 5th: from 10:00 PM until 7:00 AM: NB lane closures at various location along I-880 between 5th Avenue and High Street
Advance warning changeable message signs, detour signs and construction crew flaggers will be in place to assist motorists traveling in the area.
This work is weather dependent and will be rescheduled if necessary. Motorists are advised to expect delays and allow extra time for their commute. Please drive with caution through the construction zone, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.
California Highway Patrol will be on site during night closures.
For more information about this Caltrans construction project, visit the website at: http://www.dot.ca.gov/dist4/projects/88023rd29thovercrossing/
Closure information and real-time traffic maybe found on Caltrans QuickMap: http://quickmap.dot.ca.gov/.
Follow us on Twitter: @CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
SR-61 Full Posey Tube Closures Overnight July 31-August 2, 2017 for Maintenance
State of California • Department of Transportation
TRAFFIC ADVISORY
Date: July 31, 2017
District: 4 - Oakland
Contact: Chiconda V Davis
Phone: (510) 286-1227
FOR IMMEDIATE RELEASE
STATE ROUTE 61/FULL POSEY TUBE CLOSURE IN OAKLAND
JULY 31 THROUGH AUGUST 3, 2017
Oakland, Alameda County – The California Department of Transportation (Caltrans) has scheduled a full closure of State Route 61 (SR-61)/Oakland Posey Tube starting Monday night, July 31 through Thursday morning, August 3, 2017 from 10:00 PM to 4:30 AM, to conduct re-lamping and tunnel washing operation.
Closure information is as follows:
• The SR-61/Oakland Posey Tube is closed starting Monday night, July 31 through Thursday morning August 3, 2017.
• Follow detour signs posted near and before Posey Tube entrance
Advance warning changeable message signs and detour signs will be in place to assist motorists traveling in the area.
This work is weather dependent and will be rescheduled if necessary. Motorists are advised to expect delays and allow extra time for their commute. Please drive with caution through the construction zone, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.
California Highway Patrol will be on site during night closures.
For more information about this Caltrans construction project, visit the website at: http://www.dot.ca.gov/dist4/projects/88023rd29thovercrossing/
Closure information and real-time traffic maybe found on Caltrans QuickMap: http://quickmap.dot.ca.gov/.
Follow us on Twitter: @CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
TRAFFIC ADVISORY
Date: July 31, 2017
District: 4 - Oakland
Contact: Chiconda V Davis
Phone: (510) 286-1227
FOR IMMEDIATE RELEASE
STATE ROUTE 61/FULL POSEY TUBE CLOSURE IN OAKLAND
JULY 31 THROUGH AUGUST 3, 2017
Oakland, Alameda County – The California Department of Transportation (Caltrans) has scheduled a full closure of State Route 61 (SR-61)/Oakland Posey Tube starting Monday night, July 31 through Thursday morning, August 3, 2017 from 10:00 PM to 4:30 AM, to conduct re-lamping and tunnel washing operation.
Closure information is as follows:
• The SR-61/Oakland Posey Tube is closed starting Monday night, July 31 through Thursday morning August 3, 2017.
• Follow detour signs posted near and before Posey Tube entrance
Advance warning changeable message signs and detour signs will be in place to assist motorists traveling in the area.
This work is weather dependent and will be rescheduled if necessary. Motorists are advised to expect delays and allow extra time for their commute. Please drive with caution through the construction zone, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.
California Highway Patrol will be on site during night closures.
For more information about this Caltrans construction project, visit the website at: http://www.dot.ca.gov/dist4/projects/88023rd29thovercrossing/
Closure information and real-time traffic maybe found on Caltrans QuickMap: http://quickmap.dot.ca.gov/.
Follow us on Twitter: @CaltransD4. Caltrans appreciates your patience as we work to maintain California’s highways. Please #BeWorkZoneAlert.
###
Subscribe to:
Posts (Atom)